Los Angeles County, CA
Albert Robles Center for Water Recycling and Environmental Learning
Client: Water Replenishment District of Southern California
Our Role: Preliminary Design, Pipeline Component Final Design, Program Management, Procurement Management, Contract Compliance

The Central and West Coast Groundwater Basins in Southern Los Angeles County supply drinking water for over 4 million people—11% of California’s population. Groundwater in these basins has traditionally been replenished by three sources: imported water, stormwater, and recycled water. Due to persistent drought, growing demand for imported water, and environmental restrictions, water districts throughout California have attempted to develop solutions to reduce the strain on imported water. To increase the sustainability and resilience of Southern Los Angeles County’s water supply, the Water Replenishment District created the Water Independence Now (WIN) program to expand the use of recycled water to recharge the basin using a completely local, sustainable source of water for replenishment.
GFT is part of the integrated program management team, from project development through transitional operation, for the construction of the Albert Robles Center for Water Recycling and Environmental Learning, an advanced water treatment facility (AWTF) in Pico Rivera. In this role, our firm led the design-build procurement phase for this centerpiece of the WIN program, preparing Requests for Letters of Interest (LOI), Requests for Qualifications (RFQ), and detailed Requests for Proposals (RFP). The team also developed final design for connections to existing tertiary water pipelines, as well as brine disposal facilities, as part of the overall WIN program.
The state-of-the-art AWTF will produce an annual 3.25 billion gallons of ultra-pure recycled water to be percolated and injected into underground aquifers to replenish the Central Basin. The facility will help eliminate the need to import water for replenishment. For the project’s second phase, the team provided program management support and assisted in contract negotiations with the design-build team. Since commencing the design-build period, program management has included oversight of the designer and contractor to ensure contract compliance, permitting, and utility coordination.
Our firm also provided final design for a 1,300-foot, 16-inch high-density polyethylene (HDPE) pipeline to carry brine from the AWTF to an existing sewer line for disposal, in accordance with state and federal requirements. The team conducted regular on-site inspections, monitoring, and reporting to ensure the implementation of best management practices (BMPs) during pipeline construction. It also assisted with the conceptual development of potential locations, concepts, and criteria for a future regional brackish water reclamation project.
Key Features
- New AWTF produces 3.25 billion gallons of recycled water each year.
- 1,300-foot HDPE disposal pipeline carries brine to existing sewer system.
- Pipeline construction in accordance with appropriate BMPs ensures environmental protection.
Outcomes
Featured Projects

Long-Term Control Planning and GIS Mapping for Hazleton Sewer System

Houston Area Water Supply System Program Management

Emergency Structural Repairs Restore X425 Bronx School Pool

Palos Verdes Recycled Water Pipeline and Lago Seco Pump Station Design

Valley Center North County Emergency Water Storage Project

Illinois’ Central Tri-State Tollway (I-294) Reconstruction

Meadowlands Pedestrian Bridge Expansion at MetLife Stadium

Gambo Bridge Replacement at Naval Support Facility Dahlgren

Orange County Coastal Storm Program Management

San Antonio International Airport Consolidated Car Rental Facility

14th Street Station Complex Accessibility and Modernization

Center Street Water Treatment Plant Upgrade

Houbolt Road Extension and Diverging Diamond Interchange (DDI)

CREATE P3 Forest Hill Flyover Bridge and 71st Street Grade Separation

Lake DeForest Water Treatment Plant Upgrade and PFAS Removal Design

Ocean Outfall Legislation Program and Construction Management Services
Featured News & INSIGHTS
How Tennessee DOT Modernized Work Zone Management Through an IT/OT Partnership

Searching for Water: Engineering Solutions for the Colorado River’s Survival

UPCOMING 10/15: The Good, the Bad & the Biosolids: Carlisle’s Path to Class A

UPCOMING 10/22: Taking Back Control: Managing Cost and Risk Through Collaborative Delivery

GFT Welcomes Fuller as Transit & Rail Global Business Line Director

Brown Receives 2026 George Warren Fuller Award From AWWA

John Sadler, PE

Abe Khademi, PEng