Baxter Water Treatment Plant Raw Water Basin Dredging
Client: Philadelphia Water Department
Our Role: Preliminary Assessment, Permitting, Bidding and Construction Services

The Philadelphia Water Department (PWD) is the public water utility for the City of Philadelphia, providing integrated drinking water, wastewater, and stormwater services for over 2 million residents in the city and surrounding communities. The PWD sources its drinking water from the Delaware and Schuylkill Rivers. The Samuel S. Baxter Water Treatment Plant (WTP), the largest of PWD’s three WTPs, pulls and treats water from the Delaware River to supply approximately 60% of the area’s drinking water.
The PWD diverts water from the Delaware River into a 24-acre manufactured raw water basin for temporary storage before treatment. Over time, river sediment accumulates in the basin, diminishing the basin’s water storage capacity. The PWD conducts maintenance dredging to remove the sediment, restore the basin to its designed capacity, and deliver over 200 million gallons of quality water daily to its customers.
When the PWD last dredged the basin in 2008, 350,000 cubic yards of material were removed. Based on a 2018 bathymetric survey, GFT determined the sediment’s location, depth, and volume that had accumulated since the previous dredging. The sediment layer totaled 202,000 cubic yards and ranged from 3 to 17 feet thick.
GFT coordinated with the Pennsylvania Department of Environmental Protection and the New Jersey Department of Environmental Protection (NJDEP) to prepare a sediment sampling and analysis plan (SSAP). The SSAP received approval from the NJDEP Office of Dredging and Sediment Technology and satisfied the regulatory requirements for disposing of dredge material.
A barge supported the drilling equipment to locate and obtain sample cores. Samples were photographed, logged, and prepared for laboratory analysis according to the approved SSAP. GFT prepared a sediment sampling and analysis report summarizing the analytical results to support dredge material disposal and project permitting.
Concurrent with the sediment sampling, GFT environmental scientists conducted a wetland delineation around the work area. The discovery of wetlands would have necessitated additional avoidance measures or possibly changed permit authorizations. The fieldwork confirmed the absence of wetlands, allowing federal and state coordination and permitting to proceed on schedule.
GFT coordinated with the Pennsylvania Natural Heritage Program to comply with the Pennsylvania Conservation Explorer and Pennsylvania Natural Diversity Inventory (PNDI) environmental review process. The project’s PNDI identified potential conflicts with species of concern, including bald eagles, marsh wrens, turtles, and protected plant species. GFT coordinated with the Pennsylvania Game Commission to minimize impact in each case.
When the project area was identified as being within proximity of a known bald eagle nest, GFT completed a bald eagle screening with supporting mapping and concluded that the dredging project would not affect the eagle’s nesting activities based on the project’s distance from the nest and landscape buffers. While not protected under the Endangered Species Act, bald eagles are federally protected under the Bald and Golden Eagle Protection Act.
Key Features
- Immersive entry corridor represents the beginning and expansion of the universe.
- Interactive exhibit stations translate cosmology concepts into hands-on learning.
- Integrated digital projections and multimedia displays showcase complex concepts.
- Lighting and material strategies shape perception of scale and time.
- Flexible exhibit layout supports educational storytelling.
Outcomes
- The raw water basin was restored to its designed capacity, supporting a reliable water supply for Philadelphia area residents.
- Careful consideration for endangered and threatened species supports their continued survival.
Featured Projects

Long-Term Control Planning and GIS Mapping for Hazleton Sewer System

Palos Verdes Recycled Water Pipeline and Lago Seco Pump Station Design

Valley Center North County Emergency Water Storage Project

Gambo Bridge Replacement at Naval Support Facility Dahlgren

Center Street Water Treatment Plant Upgrade

Lake DeForest Water Treatment Plant Upgrade and PFAS Removal Design

Ocean Outfall Legislation Program and Construction Management Services

Wastewater Consent Decree Program Management and Construction Management Services

Baxter Water Treatment Plant Raw Water Basin Dredging

Fish Passage Design at the Adam T. Bower Memorial Dam

Tunnel Boring for WHCRWA’s Major Water Supply Project
Featured News & INSIGHTS
Searching for Water: Engineering Solutions for the Colorado River’s Survival

How Updated Data and Regional Detention Are Reducing Flood Risk in Texas

UPCOMING 10/15: The Good, the Bad & the Biosolids: Carlisle’s Path to Class A

UPCOMING 10/22: Taking Back Control: Managing Cost and Risk Through Collaborative Delivery

Brown Receives 2026 George Warren Fuller Award From AWWA

In the News: WHCRWA Honors GFT’s Wayne Ahrens for 25 Years of Service

Abe Khademi, PEng

Amy Dziuk, PE, CFM