Carlisle, Pa.
Biosolids Management Plan and Design
Client: Carlisle Borough
Our Role: Planning, Assessment, and Design Services

Carlisle Borough set out to modernize biosolids management at the Carlisle Regional Water Pollution Control facility while meeting evolving regulatory requirements and community expectations. The Borough needed a clear, actionable path to achieve Class A biosolids stabilization, reduce odors, and support long-term, cost-effective operations.
At the same time, they had to evaluate existing infrastructure, navigate complex state and federal regulations, and identify viable end-use opportunities for beneficial reuse, all while maintaining reliable treatment performance.
GFT partnered with the borough to develop a comprehensive, step-by-step biosolids management plan grounded in technical insight and real-world application. Our team began by assessing current operations, establishing baseline conditions, and evaluating existing solids handling facilities and equipment.
We then analyzed the regulatory landscape and conducted a regional market assessment to identify reuse opportunities. Building on this foundation, we developed and screened multiple treatment alternatives, collaborating closely with borough stakeholders through an alternatives screening workshop to align solutions with their goals.
From there, we advanced four viable process trains for detailed evaluation and performed comparative analyses to identify the most effective path forward. We documented our findings in a concise, decision-focused biosolids management plan and recommended anaerobic digestion and thermal drying with upgraded sludge thickening and dewatering systems.
Following plan completion, we advanced the design, moving the project from planning into implementation with a clear path forward.
Key Features
- Comprehensive evaluation of existing facilities, regulatory requirements, and biosolids reuse markets.
- Collaborative alternatives analysis supported by stakeholder workshops and data-driven decision-making.
- Integrated planning and design to support Class A biosolids production and odor reduction.
Outcomes
- Positioned the borough to implement a sustainable, Class A biosolids program that supports safe, beneficial reuse and prepares for future regulatory compliance.
- Reduced long-term operational risks and costs through informed process selection and phased implementation.
- Improved community impact with solutions designed to minimize odors and enhance environmental stewardship.
Featured Projects

Modernizing Building Systems for Long Beach Water Department Operations

Long-Term Control Planning and GIS Mapping for Hazleton Sewer System

Palos Verdes Recycled Water Pipeline and Lago Seco Pump Station Design

Priest Rapids and Wanapum Dam Safety Engineering Services

Rehabilitation of Six Thunder Bay Structural Culverts

Gambo Bridge Replacement at Naval Support Facility Dahlgren

Risk-Informed Decision-Making at Union Valley Dam

Orange County Coastal Storm Program Management

Garden State Parkway Shoulder Widening Milepost 30-35

Ohio Statewide GIS Solutions Powered by Esri Technology
Featured News & INSIGHTS
What’s Driving the Global Data Center Boom?

How Updated Data and Regional Detention Are Reducing Flood Risk in Texas

The Good, the Bad & the Biosolids: Carlisle’s Path to Class A

Rethinking Flood Risk: Identifying and Reducing Impacts Without Dams

In the News: Tackling Utility Emergency Preparedness With Whole-Community Resilience

In the News: WHCRWA Honors GFT’s Wayne Ahrens for 25 Years of Service

Abe Khademi, PEng

Amy Dziuk, PE, CFM