Prince George’s County, MD
Broad Creek Augmentation Conveyance System
Client: Washington Suburban Sanitary Commission
Our Role: Design, Engineering, Public Involvement, Geotechnical Investigation, Construction Management, and Inspection

The Broad Creek Pumping Station (PS) pumps wastewater to the Piscataway Wastewater Treatment Plant for treatment. In recent years, heavy rainfall caused untreated wastewater to overflow into local waterways. To help mitigate this concern, the Washington Suburban Sanitary Commission (WSSC) called on GFT, as part of a joint venture, to design the Broad Creek Augmentation Conveyance System.
GFT developed and evaluated pipeline routing alternatives and implemented the final design. The study process involved close coordination with the Maryland State Highway Administration, Prince George’s County Department of Public Works, the Maryland‑National Capital Parks and Planning Commission, the Maryland Department of the Environment, and other permitting agencies to determine potential constraints to the suggested alternatives.
Based on the final alignment selection, the project team prepared the design for a new force main, gravity sewer, and pressure sewer from the PS to the WWTP. Also, new headworks and emergency storage at the WWTP and improvements to the PS were designed to increase system capacity. The new conveyance system includes 5 miles of pipeline, sections of which were required to traverse environmentally sensitive areas, as well as National Park Service lands in a historic district. To minimize community and environmental impacts, the project team used microtunneling for 8,700 feet of pipeline.
Key Features
- New parallel conveyance system included a 48-inch force main, 60-inch gravity sewer, and 42-inch pressure sewer.
- Sections of the pipeline run through sensitive environmental areas and cross through National Park Service lands in a historic district.
- To minimize impact, microtunneling was utilized for installation of seven sections of the conveyance system for total tunneled length of 8,700 feet.
Outcomes
- Met accelerated schedule for 100 percent design drawings.
- Eliminated wastewater overflows.
- Protected sensitive environmental and historic areas.
- Outstanding Project Award, 2021, American Council of Engineering Companies of Maryland, Engineering Excellence Awards.
- Honor Award, 2021, American Council of Engineering Companies Metro Washington, Engineering Excellence Awards.
- National Recognition Award, 2021, American Council of Engineering Companies, Engineering Excellence Awards.
Featured Projects

Long-Term Control Planning and GIS Mapping for Hazleton Sewer System

Emergency Structural Repairs Restore X425 Bronx School Pool

Tradepoint Atlantic Berth Modernization Structural Design

VRE Manassas Park Station Parking Expansion

Gambo Bridge Replacement at Naval Support Facility Dahlgren

Garden State Parkway Shoulder Widening Milepost 30-35

Center Street Water Treatment Plant Upgrade

Harry W. Nice/Thomas “Mac” Middleton Bridge Replacement

Purple Line Light Rail Transit Project

Paw Paw Tunnel Slope Stabilization Project

MTA New York City Transit Environmental Compliance Services

Route 252 Springton Reservoir Dam Spillway Bridge Improvements
Featured News & INSIGHTS
GFT, Clients Honored with 2026 ACEC Engineering Excellence Awards

GFT Selected to Lead Program Management for Prince William Water’s Wastewater Infrastructure Upgrade

Transforming and Strengthening Bridges Using Ultra-High Performance Concrete

Water Asset Prioritization: Harnessing Data to Streamline Infrastructure Management

Walter Kutschke, PhD, PE

David Haywood, PE