Dunkirk, Md.
Dunkirk Park Tennis Complex Design and Site Engineering
Client: Calvert County, Md.
Our Role: Site/Civil Engineering, Structural Engineering, Architecture, Surveying, Permitting, Planning

Calvert County set out to enhance recreational opportunities at Dunkirk Park with a new tennis and pickleball complex that could serve the growing community.
The selected 4.5-acre expansion area presented significant constraints. Steep slopes, specimen trees, and a surrounding forest limited the available footprint. Soil conditions further restricted where an on-site sewage disposal system could be located to support a new restroom facility.
The County needed a site layout that maximized functionality and user experience while minimizing impacts to sensitive environmental features. The project also required planning commission approval and variances related to environmental impacts. The solution had to balance recreation, constructability, permitting, and long-term site performance.
GFT provided civil and structural engineering, landscape architecture, architecture, and surveying services for the design and permitting of the new Dunkirk Park complex. Our team delivered an integrated site solution that aligned recreational programming, environmental constraints, grading strategy, and supporting infrastructure.
Adapting the design to the challenging site, the team developed a layout that optimized circulation, minimized impacts to specimen trees, and reduced unnecessary earthwork. The new courts were carefully positioned within the terrain and supported by coordinated grading and stormwater management to promote long-term performance.
The design also incorporated the infrastructure required to activate the complex, including a parking lot with loop road access, a restroom building, an on-site sewage disposal system with sanitary pump station, extension of the park water system, and site lighting to enhance safety and usability.
The team guided the project through planning commission review and secured required environmental variance approvals, positioning the project for successful construction and sustained operation.
Key Features
- 4.5-acre park expansion designed within environmentally constrained terrain.
- Five hard-surface tennis courts and four pickleball courts.
- Pedestrian plaza and spectator viewing areas.
- 75-space paved parking lot with loop road access.
- 484-square-foot restroom building.
- On-site sewage disposal system with sanitary pump station.
- Extension of existing park water service.
- Integrated stormwater management systems.
- Court and parking lot lighting for extended usability.
Outcomes
- Expanded recreational capacity for tennis and pickleball programming.
- Improved visitor access, circulation, and parking efficiency.
- Reduced environmental impacts through strategic site planning.
- Balanced grading and earthwork to support long-term performance.
- Enhanced safety and usability through coordinated lighting design.
- Delivered fully permitted, construction-ready documentation.
- Reinforced Dunkirk Park as a year-round community destination.
Featured Projects

Modernizing Building Systems for Long Beach Water Department Operations

27th Avenue MRF Upgrades Advance Phoenix’s Zero Waste Vision

Adler Planetarium Cosmology Gallery Exhibit Design

Dunkirk Park Tennis Complex Design and Site Engineering

New Delaware State Police Troop 6 Headquarters

Miami Beach Hostile Vehicle Attack Vulnerability Assessment

Inclusive and Sustainable Public Housing Transformation at Todt Hill Houses

New Fayette County Correctional Facility
Featured News & INSIGHTS
Programming Correctional Facilities: What Agencies Need to Know Before Design Begins

How Occupational Therapy Shapes Human-Centered Design in Architecture

Beyond Hollywood: The Reality of Modern Fire Protection

The Off-Site Advantage: Redefining How We Build

In The News: Strategic Design Insights for Justice Facility Security

GFT Advances National Standing as a Leader in Architecture & Integrated Design

Mandar Manjarekar, PE, PMP

Stephanie Templeton, PE