City of Oshawa and the Region of Durham, Ontario
Environmental Assessment and Detailed Design for Stevenson Road North Corridor Urbanization
Client: City of Oshawa/The Regional Municipality of Durham, Ontario
Our Role: Consultant Responsible for Environmental Assessment, Detailed Design and Construction Support

Stevenson Road North is a key north–south corridor within Oshawa’s Northwood Business Park, yet its existing rural condition no longer aligns with the demands of a growing employment area and evolving transportation network. The corridor must support increased development, improve safety, and accommodate a wider range of users, all while maintaining essential municipal services. At the same time, the city needed to balance immediate infrastructure needs with community concerns about widening and property impacts. GFT worked with the City of Oshawa and the Region of Durham to shape a forward-looking approach that addresses current deficiencies, supports near-term growth, and preserves flexibility for long-term expansion within a constrained corridor.
Key Features
- Municipal Class Environmental Assessment Schedule ‘C’ and detailed design assignment.
- Full reconstruction and urbanization from a two-lane rural cross-section with open ditches and granular shoulders to a complete urban arterial road.
- Active transportation improvements, including a new multi-use pathway.
- Intersection improvements to address operations, Accessibility for Ontarians with Disabilities Act (AODA), and corridor tie-ins, including new traffic signals at Conlin Road West and upgraded signals at Taunton Road West, including bike signals.
- Drainage upgrades, including conversion from rural drainage conditions to an urbanized stormwater drainage system, with coordination around culverts, low points, and roadside drainage features.
Outcomes
- Advanced a rural-to-urban corridor transformation that supports municipal growth, improved mobility, and complete street objectives.
- Augmented roadway safety through geometric refinements, vertical curve corrections, intersection grading, roadside safety upgrades, and better corridor lighting.
- Enhanced pedestrian and cycling connectivity through the introduction of active transportation facilities along the corridor.
- Improved accessibility and intersection functionality through coordinated grading, tie-ins, lighting, and AODA-informed design development.
Featured Projects

Environmental Assessment and Detailed Design for Stevenson Road North Corridor

Rehabilitation of Six Thunder Bay Structural Culverts

Gardiner Expressway Section 5 Detailed Design

Scarborough Subway Extension & Yonge North Subway Extension Projects

Queen Elizabeth Way (QEW) Highway Rehabilitation

Ontario Highway 401 Resurfacing & Road Bridge Rehabilitation

Region of Peel Airport Road Widening
Featured News & INSIGHTS
Replacing a Chicago Rail Bridge While Maintaining Continuous Service

What Power Utilities Can Do Now: A Roadmap to Prepare for Extreme Weather

Strong Foundations for Reliable and Resilient Power Delivery

Scott Bennett Elected to ITS America Board of Directors

In the News: GFT’s Interstate 5 Reconstruction Project Featured in Roads & Bridges Magazine

Surbhi Kamboj, AICP, LEED AP

Kevin Burgess, PE




