Suffolk County, NY
Forge River Watershed Sewer Project
Client: Suffolk County Department of Public Works
Our Role: Planning, Design, and Construction Management

Suffolk County, New York, relies heavily on onsite waste disposal systems consisting of septic systems and cesspools, with nearly 70% of its 1.5 million residents using them for wastewater disposal. In the Mastic-Shirley area, these systems have deteriorated over decades, often failing during heavy rains or coastal storms like Superstorm Sandy in 2012. These failures have led to increased nitrogen levels in groundwater and surface waters like the Forge River, causing significant coastal degradation and threatening the environment and public health.
To address these issues, the Suffolk County Department of Public Works launched the Forge River Watershed Sewer Project, the county’s largest sewer infrastructure initiative in four decades. This $228 million project will reduce nitrogen pollution, restore the health of local waterways, and enhance coastal resilience for thousands of residents. It is a critical component of the broader $408.8 million Suffolk County Coastal Resiliency Initiative.
Our firm delivered comprehensive planning, design, and construction management services for a new sewer collection and conveyance system and a 1 million gallons per day advanced wastewater treatment facility (AWTF) to reliably treat wastewater and reduce environmental impact.
Using building information modeling (BIM), we created detailed digital models that improved interdisciplinary collaboration and streamlined construction. Geographic information system (GIS) tools helped manage infrastructure data across the design and construction phases, optimizing workflows and enhancing project execution.
We led an extensive public outreach campaign that included open houses, informational flyers, and a dedicated project website. These efforts built trust, addressed community concerns, and culminated in a successful public referendum to create a new sewer district.
Our team produced engineering reports and detailed designs for the low-pressure collection system and AWTF. Property investigations were conducted to determine optimal installation points for grinder pump units. We also secured required regulatory permits and oversaw construction contracts across nine bid packages.
Construction milestones include:
- AWTF construction: 2022–2025.
- Sewer system installation: 2022–2024.
- Grinder pump installations and home connections: 2024–anticipated 2026.
When complete, the project will service approximately 2,450 parcels within the newly created sewer district, eliminate reliance on failing onsite waste disposal systems, and protect Long Island’s vulnerable coastlines for generations by ensuring reliable sewage treatment plant operations and delivering clean water back into the environment.
Key Features
- The AWTF eliminates outdated onsite waste disposal systems, significantly improving wastewater reliability and coastal storm resilience.
- Public outreach ensured transparency, educated residents, and fostered informed decision-making.
- BIM and GIS tools optimized planning, design, and construction coordination.
Outcomes
- Reduced nitrogen loading protects surface and groundwater resources, improving water quality and helping restore the Forge River and nearby wetlands.
- Infrastructure improvements bolster natural defenses against future storm surges and climate-related events, improving coastal resilience.
- Eliminating failing onsite waste disposal systems improves public health, creating a safer and cleaner environment for current and future generations.
- Long Island Business News, 2023, Real Estate, Architecture & Engineering Awards, Top Infrastructure Project.
- American Council of Engineering Companies of New York, 2026, Engineering Excellence Awards, Gold Award for Waste and Storm Water.

Featured Projects

Palos Verdes Recycled Water Pipeline and Lago Seco Pump Station Design

Valley Center North County Emergency Water Storage Project

Priest Rapids and Wanapum Dam Safety Engineering Services

Rehabilitation of Six Thunder Bay Structural Culverts

Gambo Bridge Replacement at Naval Support Facility Dahlgren

Risk-Informed Decision-Making at Union Valley Dam

Orange County Coastal Storm Program Management

Garden State Parkway Shoulder Widening Milepost 30-35

Ohio Statewide GIS Solutions Powered by Esri Technology
Featured News & INSIGHTS
Searching for Water: Engineering Solutions for the Colorado River’s Survival

How Updated Data and Regional Detention Are Reducing Flood Risk in Texas

UPCOMING 10/15: The Good, the Bad, and the Biosolids: Carlisle’s Path to Class A

UPCOMING 10/22: Taking Back Control: Managing Cost and Risk Through Collaborative Delivery

In the News: Tackling Utility Emergency Preparedness With Whole-Community Resilience

Brown Receives 2026 George Warren Fuller Award From AWWA

Abe Khademi, PEng

Amy Dziuk, PE, CFM










