California
Hydropower Facility Modernization
Client: Confidential Utility
Our Role: Hydroelectric Powerhouse Analysis

One of our utility clients, located in northern California, has been providing quality water to the region for more than 100 years. Today, the utility has grown into a multifaceted water and power agency, operating multiple powerhouses, including a 39-megawatt hydroelectric facility. This facility faced reliability and operational challenges due to aging system components.
To continue efficient electricity generation, the utility needed to understand the condition of its equipment and contemplate making substantial capital expenditures. The utility sought a partner to guide future improvements, maintain unit reliability, and determine the feasibility and economic viability of increasing the power output of its turbines and generators.
Hydroelectric powerhouse refurbishment projects enable utility owners to extend the useful lifecycles of their facilities, enhance efficiency and dependability, and boost power generation capacity. Over the past 50 years, the facility has deteriorated while regulations and energy market dynamics have changed. It was essential to determine which components could be repaired and which portions of the system needed to be replaced, substantially refurbished, or upgraded. GFT conducted a multi-phase powerhouse condition assessment of the critical systems, including the hydro turbine, generator, and balance of plant.
The first phase focused on detailed project scoping, equipment testing, and feasibility studies to assess the potential for increasing the unit’s capacity. This included an uprate feasibility study to evaluate the possibility of increasing the power output, which involved cost-benefit analysis and equipment efficiency evaluations. The analysis also examined the utility’s potential revenue increase to determine the return on investment.
The second phase of the project identified which original equipment could be replaced, refurbished, or upsized without compromising system safety or functionality. This required a comprehensive evaluation of the entire system, beyond the hydropower plant’s physical assets and controls system. Our team assessed flow data, water availability and head potential, and system performance, along with their respective impacts on the hydro facility’s operations.
We facilitated all stakeholders in a workshop to weigh the pros and cons of various scenarios, discuss cost estimates, and make final recommendations, which included:
- Equipment maintenance and refurbishment: Complete generator cleaning while concurrently strategically preparing for a generator rewind, maximizing upcoming outage opportunities.
- Electrical system improvements: Generator maintenance, generator stator ground protection relay installation, generator step-up transformer online monitor installation, and a gantry crane investment for rotor inspection and maintenance.
- Mechanical equipment maintenance, replacement, and refurbishment: Runner and seal removal and restoration, replacement of turbine and wicket gates, draft tube reconstruction and restoration, canal maintenance, pipe wall thickness testing program initiation, and regular inspection and maintenance scheduling.
Key Features
- 39-megawatt hydroelectric facility.
- Comprehensive hydroelectric power plant assessment.
- Cost-effective recommendations to extend the life of the hydropower plant and improve efficiency.
Outcomes
- Increased power capacity leading to greater revenue generation.
- Positioned the powerhouse for future technological upgrades and significant increase in power generation, ensuring its contribution to the region’s power supply and increasing its service life.
- Reinforced the utility’s commitment to maintaining critical infrastructure with minimal environmental impact.





Featured Projects

High-Availability Data Center and Security Operations Control Center Design

Meadows Maintenance Complex Substation Design

Substation and Transmission Design for Solar Integration in Maine

NREL EV Infrastructure Design and Siting Assessment Tool

Zero-Emission Fleet Planning for the Chicago Transit Authority (CTA)

EEW Group Wind Energy Monopile Manufacturing Facility

Nassau Inter-County Express Battery Electric Bus Charging

Air Permitting and Compliance for Denver Metro Medical Facilities

Hydropower and Power Distribution Facilities Security Risk Assessment

Hydroelectric Plant Penstock Data Acquisition System Upgrade
Featured News & INSIGHTS
What’s Driving the Global Data Center Boom?

Quantitative Risk Assessments to Strengthen Resilience Across Infrastructure Systems

From Data to Decisions: Connecting BIM, GIS, and Infrastructure Intelligence

Surviving the Swings: Power Systems in Extreme Weather

In the News: Tackling Utility Emergency Preparedness With Whole-Community Resilience

GFT Names Andrew Shufelt as Data Centers Market Sector Leader

Elliott Plack

Brian Seip, PE, CxA, LEED AP BD+C, CEA, REP, NCTI, ENV SP