Baltimore, MD
Improved Bus Fleet Storage for Kirk Avenue Bus Facility
Client: Maryland Department of Transportation Maryland Transit Administration
Our Role: Project Management, Structural, MEP, Industrial

Situated snugly on 6.7 acres in an urban residential environment, the original Kirk Avenue Bus Facility in northeast Baltimore, built in 1947, was running out of room to store and maintain its bus fleet.
The limited space within the facility required that approximately 175 buses frequently be shuffled to perform servicing activities as well as be idled to warm the buses in the winter or cool them in the summer, resulting in noise that negatively impacted the surrounding residential community. Despite upgrades to the wash bays and inspection areas over the years, operations staff members were challenged to efficiently complete bus storage, maintenance, fueling, vaulting, and washing activities.
The Maryland Department of Transportation Maryland Transit Administration (MDOT MTA) needed to expand the facility to:
- Reduce noise output.
- Accommodate the existing and programmed bus fleet.
- Improve maintenance and operating efficiency.
- Improve transit service delivery.
- Modernize employee working conditions.
The solution was a two-phase project to demolish and redevelop the existing Kirk Avenue facility, replacing it with an energy-efficient administration building with enclosed bus storage, fueling and wash areas, and an enclosed maintenance facility with interior bus circulation. The new Kirk Avenue Bus Facility features sustainable design and practical efficiency that improves the “good neighbor” relationship with the community and reduces the facility’s carbon footprint.
The project, which spanned three on-call contracts, began as a single project for GFT in 2009. It was subsequently separated into two phases and culminated in construction completion in 2021. GFT provided construction-related services for both phases, including overall coordination and management, as well as industrial and structural design. For Phase II, GFT provided mechanical, electrical, and plumbing design.
Phase I involved the construction of a 100,000-square-foot maintenance building across the street from the existing facility, including:
- Associated parts storage.
- Chassis wash.
- Interior dead bus storage.
- Administrative area.
- Training room.
- Locker space.
- On-site staff parking.
The facility has six articulated bus maintenance bays, 10 standard bus maintenance bays, and 13 dead bus storage bays. Elevated offices provide maximum viewshed for maintenance oversight. The two-bay chassis wash allows maintenance staff to clean the underside of the buses via portable lifts.
Placing administrative and support areas on the ground and second floors minimizes the building’s footprint. Utilizing the existing topography of the project site, the team embedded a portion of the building into a slope, helping to lessen the building’s external footprint. Buses can circulate within the building, reducing vehicle visibility to the neighboring community. The building’s heating and ventilation systems are located within a mechanical room to reduce noise output.
Upon completion of the Phase I maintenance building, the existing Kirk Avenue facility was torn down and replaced with a 180,000-square-foot bus storage facility with space to house and maintain 145 buses. The interior storage will reduce bus shuffling, idling, and noise output while providing a more aesthetically pleasing view of the facility. In addition, bus fueling and washing are performed within the facility, limiting bus circulation to the interior. The storage building also contains:
- Bus transportation administrative spaces.
- Facilities maintenance.
- Vaulting operations.
- Fuel storage with off-street refill capability.
- On-site parking spaces for guests and visitors.
Key Features
- Energy-efficient mechanical equipment lessens the facility’s carbon footprint.
- Internal bus fueling and washing capabilities reduce noise and visibility to the surrounding neighborhood.
- Use of existing sloped topography minimizes new building’s footprint and external visibility.
Outcomes
- Makes complex scientific concepts accessible to diverse audiences.
- Accommodates growing and modern bus fleet.
- Improves maintenance and operational efficiency, reducing overall operating costs.
- Modernizes employee working conditions.
- Increases goodwill in the neighborhood by reducing noise and improving aesthetics.
- 2022 Maryland Quality Initiative (MdQI) Award of Excellence for MdQI: MTA Modal for project over $5M.
Featured Projects

Port Authority Transit Corporation Control Center Relocation

Modernizing WMATA’s Backup Operations Control Center

High-Availability Data Center and Security Operations Control Center Design

Meadows Maintenance Complex Substation Design

Marshall University – New Flight School at Yeager Airport

Purple Line Light Rail Transit Project

DRJTBC Southern Operations and Maintenance Facilities Improvements

Pittsburgh Regional Transit South Hills Village Rail Center Design

Long Island Rail Road Syosset Station Design

Nassau Inter-County Express Battery Electric Bus Charging

MTA New York City Transit 170 Street Station Accessibility Improvements

MTA New York City Transit Livonia Avenue Station Mobility Project

SEPTA 69th Street Transportation Center West Terminal Rehabilitation

North Avenue Rising Penn-North Metro SubwayLink Station Improvements

Improved Bus Fleet Storage for Kirk Avenue Bus Facility
Featured News & INSIGHTS
Why Experience Matters in Federal Infrastructure Consulting

Tourism Engineering for Lasting Local Impact

Beyond Hollywood: The Reality of Modern Fire Protection

From Data to Decisions: Connecting BIM, GIS, and Infrastructure Intelligence

GFT Advances National Standing as a Leader in Architecture & Integrated Design

ACEC Recognizes GFT, Clients With 15 Engineering Excellence Awards

William Peterson, PE, LEED AP, ENV SP, CBSI

Brian Seip, PE, CxA, LEED AP BD+C, CEA, REP, NCTI, ENV SP