Montgomery County, PA
Lafayette Street Extension Project
Client: Norristown, Pa.
Our Role: Final design, right-of-way acquisition services, and construction consultation

Norristown is the seat for Montgomery County, Pa., one of the commonwealth’s most populous and prosperous counties.
However, the borough faced a dwindling population and declining commercial activity. Among the reasons for the decline were inadequate roadways and a need for regional access points. The limited roadway network made vehicle access to Norristown time-consuming and created a disadvantage compared to other suburban areas.
Montgomery County conceived the Lafayette Street Extension Project to create transformative infrastructure improvements of road and highway access into downtown Norristown and neighboring Plymouth Township by making faster and more convenient connections to the Pennsylvania Turnpike (I-276) and other nearby highways while creating pedestrian and traffic safety improvements in the borough.
GFT provided final design, right-of-way acquisition services, and construction consultation for widening and reconstructing Lafayette Street from Barbadoes to Ford Streets. The one-mile reconstruction accommodates four travel lanes, turning lanes, on-street parking, improved sidewalks, and the reconstruction of the Schuylkill River Trail and the Chester Valley Trail between DeKalb and Ford Streets.
Roadway reconstruction created a visually pleasing urban boulevard, including a landscaped median section, to replace a drab two-way street. It dramatically improves access to downtown businesses and amenities, including a reinvigorated park along the Schuylkill River, while enhancing community walkability. New street-side parking facilities also improve accessibility.
The project also included preparing the at-grade railroad crossing on Ford Street, which crosses Lafayette Street, to install the first-ever four-quadrant railroad gate in the Southeastern Pennsylvania Transportation Authority (SEPTA) rail system. The gate system features barriers that block the roadway on both sides of the tracks for both directions of traffic, preventing vehicles from driving around the gates when a train is approaching.
Key Features
- Widened Lafayette Street.
- Reconstructed Schuylkill River Trail and Chester Valley Trail.
- New four-quadrant at-grade railroad crossing on Ford Street.
- Upgraded linear park.
Outcomes
- Spurs economic revitalization by improving access to downtown Norristown and the industrial areas of Plymouth Township from the PA Turnpike.
- Provides traffic management and congestion relief by reducing trucks along Main Street, creating two-way access to the riverfront at Ford Street, and easing congestion along Ridge Pike.
- Improves trail and pedestrian connections with wide sidewalks, upgrades near SEPTA’s Norristown Transportation Center, and better accessibility to the Schuylkill River and Chester Valley Trails.
- Improves pedestrian safety and convenience.
- Mitigates polluted runoff into the Schuylkill River in support of Montgomery County’s sustainability objectives.





Featured Projects

Interstate 4 at SR 557 Interchange Design-Build

Thornwood Crossing Connector, Roundabout & Bridge Replacement

Illinois’ Central Tri-State Tollway (I-294) Reconstruction

Modernizing WMATA’s Backup Operations Control Center

High-Availability Data Center and Security Operations Control Center Design

Meadows Maintenance Complex Substation Design

Tradepoint Atlantic Berth Modernization Structural Design
Featured News & INSIGHTS
How Tennessee DOT Modernized Work Zone Management Through an IT/OT Partnership

Quantitative Risk Assessments to Strengthen Resilience Across Infrastructure Systems

From Data to Decisions: Connecting BIM, GIS, and Infrastructure Intelligence

From Capture to Concept: Accelerating Infrastructure Planning With Remote Sensing and AI

In the News: Tackling Utility Emergency Preparedness With Whole-Community Resilience

GFT Facilitates Emergency Response Tech & Demo Day at ITS America 2026

John Sadler, PE

Elliott Plack