Allentown, PA
Lehigh County Authority Water Main Replacement
Client: Lehigh County Authority
Our Role: Pipeline Prioritization, Pipeline Design, Construction Observation, Program Management

Lehigh County Authority (LCA) is taking a proactive approach to its water main replacement strategy in its Allentown Division System. LCA serves more than 55,000 customers in Northampton and Lehigh counties, Pennsylvania. The Allentown Division system includes more than 300 miles of main, of which more than a third is older unlined cast iron pipe. Instead of waiting until age or deterioration caused failure of these mains, LCA engaged GFT to manage a pipeline replacement program. Using existing geographic information system (GIS) data, GFT established a practical and effective pipeline asset management program. The program uses data such as main break history, age, material type, and the impact of failure on critical customers such as hospitals, to prioritize the main replacements.
Throughout a three-year contract, GFT is analyzing the water system and identifying an order of replacements. The firm fully designs the water main replacements, acquires permits, and advertises the project for bidding for a select number of projects each year. Leasing agreements place rigid time constraints on each water main replacement project timeline. GFT acts as program manager to ensure the pipes are in the ground within the given timeframe. Throughout construction, an inspector is in the field to review contractor submittals and oversee construction.
Key Features
- GIS-based asset management provides a practical and effective approach to pipeline prioritization and is easy to maintain and update.
Outcomes
- Makes complex scientific concepts accessible to diverse audiences.
- Water main replacement maintains service and decreases life cycle cost.
- GIS-based asset management provides practical and efficient prioritization.
- Management of program meets lease agreement requirements.
Featured Projects

Long-Term Control Planning and GIS Mapping for Hazleton Sewer System

Houston Area Water Supply System Program Management

Palos Verdes Recycled Water Pipeline and Lago Seco Pump Station Design

Valley Center North County Emergency Water Storage Project

Gambo Bridge Replacement at Naval Support Facility Dahlgren

Orange County Coastal Storm Program Management

Ohio Statewide GIS Solutions Powered by Esri Technology

Ocean Outfall Legislation Program and Construction Management Services

Wastewater Consent Decree Program Management and Construction Management Services

Surface Water Supply Project Segment C2 Program and Construction Management

Tunnel Boring for WHCRWA’s Major Water Supply Project

Sligo Park Hills Low-Impact Development Stormwater Management Design

Lehigh County Authority Water Main Replacement
Featured News & INSIGHTS
Searching for Water: Engineering Solutions for the Colorado River’s Survival

What’s Driving the Global Data Center Boom?

UPCOMING 10/22: Taking Back Control: Managing Cost and Risk Through Collaborative Delivery

UPCOMING 11/12: PFAS in 2026: From Detection to Decisions
Brown Receives 2026 George Warren Fuller Award From AWWA

In the News: WHCRWA Honors GFT’s Wayne Ahrens for 25 Years of Service

Yovani Zelaya, PE

Abe Khademi, PEng