Meadows Maintenance Complex Substation Design

Client: Confidential Client
Our Role: Electrical and Structural Engineering for Substation Physical, Protection, and Control Design

Aerial view of an electrical substation beside multiple rail lines, transmission towers, maintenance buildings, and nearby wetlands.

The primary substation was considered the most important traction power substation facility in the NJ TRANSIT system. The substation provides 55 kV service for the traction power system and 13 kV power to the maintenance yard and the rail operations center, the command and control center for all train movements statewide. The facility required replacement with new state-of-the-art equipment and protection schemes to improve system reliability and support continued rail operations.

GFT provided design, engineering, and procurement services for the replacement of the substation. The new design consists of a 230 kV, six-bay, 18-breaker gas-insulated substation (GIS) enclosed in a new building.

The separate secondary substation was designed to be fed from the GIS to provide 13.2 kV power to switchgear at the maintenance yard and rail operations center. The protection and control system was programmed using IEEE 61850, providing an innovative control system that improved system reliability, saved rack space, and reduced hazard risk and costs.

The 230 kV system powers a 55/27 kV traction power substation through five 230/55 kV transformers, providing adequate power for rail operations. Equipment and buildings were located above the 500-year floodplain to provide enhanced system resiliency in a coastal environment.

Key Features

  • Replacement of an existing traction power substation facility.
  • 230 kV, six-bay, 18-breaker gas insulated substation enclosed in a new building.
  • Five transformers providing power for traction power operations.
  • Protection and control system programmed using IEEE 61850.
  • Separate substation providing power to maintenance yard and rail operations center.
  • Equipment and buildings located above the 500-year floodplain.

Outcomes

  • Improved system reliability for traction power operations.
  • Enhanced system resiliency in a coastal environment.
  • Reduced hazard risk and improved operational safety.
  • Continued power supply to critical rail operations infrastructure.