NJ TRANSIT Northern Bus Garage Project
Client: New Jersey Transit Corporation
Our Role: Engineering and Design

New Jersey Transit Corporation (NJ TRANSIT) operates 18 bus garages throughout the state, ranging from 20 to 120 years old. These existing maintenance facilities are currently operating at or above their capacities. The loss of bus fleet capacity during renovations hinders significant garage system rehabilitation, modernization of existing garages, or replacement of aged facilities.
New Jersey Transit Corporation (NJ TRANSIT) partnered with GFT to provide professional consulting engineering services for the new Northern Bus Garage. Phase 1A included data collection, needs assessment, development of four conceptual designs, and preparation of a project definition report. In Phase 1B, services provided include:
- Preliminary architectural design and engineering of the bus garage facility, including survey and base mapping and right-of-way engineering.
- Utility, geotechnical, and environmental investigations.
- Preparing requirements for the National Environmental Policy Act (NEPA) and developing preliminary and value engineering.
The new garage will house 500 45-foot and 60-foot transit and commuter buses. Construction details include:
- Transit bus storage, service area.
- Transit bus maintenance and inspection bays.
- Diesel fueling capabilities.
- Alternative fueling/charging station.
- Bus washing facility.
- Administrative offices and staff amenities.
- On-site parking.
The garage will accommodate diesel and zero-emissions buses, with the flexibility to transition to a 100% zero-emission fleet over time as part of New Jersey’s NJT2030 10-year strategic initiative. GFT’s facility layout design blends into the surrounding environmental context and provides complete functionality with optimum site use, including facility access, while allowing minimum impact on environmental resources.
Key Features
- Storage and maintenance of 500 45‘ and 60‘ buses.
- On-site parking for 670 vehicles, visitors, and snow removal equipment.
- Supports diesel and zero-emission buses, storage, and maintenance.
Outcomes
- Makes complex scientific concepts accessible to diverse audiences.
- Increases capacity to accommodate projected future ridership growth.
- Reduces bus overflow at other garages to increase on-time performance.
- Limits delays due to vehicle maintenance issues.
- 100% zero-emission bus ready.
Featured Projects

Thornwood Crossing Connector, Roundabout & Bridge Replacement

High-Availability Data Center and Security Operations Control Center Design

Meadows Maintenance Complex Substation Design

Tradepoint Atlantic Berth Modernization Structural Design

Zero-Emissions Fleet Transition Planning for Northwest Oregon Transit Alliance

Pennsylvania Turnpike Commission GeoBIM Implementation

San Antonio International Airport Consolidated Car Rental Facility

Ohio Statewide GIS Solutions Powered by Esri Technology

Harry W. Nice/Thomas “Mac” Middleton Bridge Replacement

Merchants Bridge Main Span Truss Replacement & East Approach Retrofit

Los Angeles World Airports Consolidated Rental Car Facility Planning
Featured News & INSIGHTS
How Tennessee DOT Modernized Work Zone Management Through an IT/OT Partnership

Beyond the Control Room: How Traffic Operations are Shaping Transportation Systems in Real Time

GFT Welcomes Fuller as Transit & Rail Global Business Line Director

In the News: Tackling Utility Emergency Preparedness With Whole-Community Resilience

Beyond Hollywood: The Reality of Modern Fire Protection

Engineering Ingenuity: Replacing Bridge A32 and Grayland Station in Urban Chicago
Surbhi Kamboj, AICP, LEED AP

Kevin Burgess, PE