Palos Verdes Estates and Torrance, CA
Palos Verdes Recycled Water Pipeline and Lago Seco Pump Station Design
Client: West Basin Municipal Water District
Our Role: Design and Construction Services

To support the West Basin Municipal Water District’s goal of expanding recycled water use for communities and parks in the Torrance area and the Palos Verdes Golf Club in Palos Verdes Estates, GFT provided design services during construction for the Palos Verdes recycled water pipeline and Lago Seco Pump Station. As demand for sustainable water sources grows, this infrastructure is expected to deliver nearly 80 million gallons of cleaned wastewater annually for irrigation, helping conserve drinking water and strengthen drought resilience. GFT led engineering and coordination across design and construction to ensure seamless integration with West Basin’s broader recycled water system.
Key Features
- Designed approximately 20,000 feet of 10-, 8-, and 4-inch PVC recycled water pipeline, including two trenchless technology segments.
- Designed a pressure-reducing and metering station to support reliable system performance.
- Designed the 500-gallon-per-minute Lago Seco booster pump station, capable of delivering over 1.4 million gallons per day, with primary and jockey pumps to meet varying irrigation demands.
- Prepared design plans, cost estimates, traffic control plans, and contract documents.
- Obtained permits and approvals across state, county, and local agencies.
- Evaluated communication alternatives to integrate the pump station into the District’s recycled water system.
- Supported land acquisition, including appraisals and preparation of acquisition offers.
- Developed 3D renderings of the proposed pump station.
- Provided engineering services during construction.
Outcomes
- Expands access to recycled water for irrigation of parks, fields, and recreation facilities.
- Reduces reliance on drinking water supplies by providing a sustainable alternative for irrigation.
- Improves water supply reliability across the service area.
- Increases capacity to deliver recycled water.
- Strengthens regional drought resilience.
- Enhances operational flexibility to meet peak and overnight demands.




Featured Projects

Long-Term Control Planning and GIS Mapping for Hazleton Sewer System

Houston Area Water Supply System Program Management

Palos Verdes Recycled Water Pipeline and Lago Seco Pump Station Design

Valley Center North County Emergency Water Storage Project

Center Street Water Treatment Plant Upgrade

Lake DeForest Water Treatment Plant Upgrade and PFAS Removal Design

Ocean Outfall Legislation Program and Construction Management Services

Wastewater Consent Decree Program Management and Construction Management Services

Surface Water Supply Project Segment C2 Program and Construction Management
Featured News & INSIGHTS
Searching for Water: Engineering Solutions for the Colorado River’s Survival

How to Negotiate NPDES Permit Limits: Lessons From 40 Years of Clean Water Act Practice

UPCOMING 10/22: Taking Back Control: Managing Cost and Risk Through Collaborative Delivery

UPCOMING 11/12: PFAS in 2026: From Detection to Decisions

Brown Receives 2026 George Warren Fuller Award From AWWA

In the News: WHCRWA Honors GFT’s Wayne Ahrens for 25 Years of Service

Yovani Zelaya, PE

Abe Khademi, PEng