Martin County, FL
Peer Review and Safety Assurance Review for US Army Corps of Engineers
Client: Martin County, FL
Our Role: Peer Review, Planning, Civil, Construction, Geotechnical, Structural, Hydraulics, Hydrology, Geology, Hydrogeology, Water Resources, Mechanical, Electrical

Through a joint venture with GEI Consultants, we performed an independent external peer review of the pre-final plans and specifications for Contract 2 of the C-44 Reservoir Project in Martin County, Florida.
This ongoing review for the U.S. Army Corps of Engineers (USACE), Jacksonville District, is a critical element of the USACE’s three-part quality improvement process to ensure the reliability of scientific and engineering analysis.
The C-44 Reservoir covers 3,400 acres of approximately 12,000 acres of land as part of the Indian River Lagoon-South Project Implementation under the Everglades Restoration Plan. This project captures local runoff for the C-44 basin, and treats some or all of the volume via sedimentation and natural transformation of nutrients, then returns it to the C-44 canal when necessary. This project is designed for flow attenuation of the St. Lucie Estuary, and water quality benefits from reduced loading of nutrients, pesticides, herbicides, and other pollutants contained in runoff presently discharged to the estuary.
We selected subject matter experts in seven disciplines to fit the scope of the external peer review. Professionals with the requisite education and experience were qualified as upper-level peer reviewers in the following areas: geotechnical engineering, engineering geology, structural engineering, hydrology and hydraulics, hydrogeology and geology, civil/construction, and electrical/mechanical engineering.
Panel members were given a site orientation briefing and then a series of documents to review that involve the design and pre-final plans and specifications for the project. These documents included the Detailed Design Report for the project, the Geotechnical Data Report pre-final edition Plans and Specifications, and a Draft Engineering Considerations and Instructions Report.
These ongoing independent external peer reviews will be vital for ensuring the project functions as designed and provides environmental/water quality improvement.
Key Features
- Safety assurance.
- Independent peer review of:
- Detailed Design Report.
- Geotechnical Data Report.
- Draft Engineering Considerations.
Outcomes
- Independent External Peer Review helps to ensure the project will meet its intended purpose of water quality improvement.
- Continuous analysis ensures reduced pollutant load in estuary runoff.
- Review C-44 reservoir specifications ensure project design is technically sound.
- Ensure the reliability of scientific and engineering analysis of USACE projects.
Featured Projects

Long-Term Control Planning and GIS Mapping for Hazleton Sewer System

Valley Center North County Emergency Water Storage Project

Priest Rapids and Wanapum Dam Safety Engineering Services

Rehabilitation of Six Thunder Bay Structural Culverts

Gambo Bridge Replacement at Naval Support Facility Dahlgren

Risk-Informed Decision-Making at Union Valley Dam

Orange County Coastal Storm Program Management

Garden State Parkway Shoulder Widening Milepost 30-35

Devil’s Kitchen Dam Auxiliary Spillway Modifications

Paw Paw Tunnel Slope Stabilization Project

Hawaiian Dam Safety Seismic Hazard Assessment
Featured News & INSIGHTS
How Updated Data and Regional Detention Are Reducing Flood Risk in Texas

How to Negotiate NPDES Permit Limits: Lessons From 40 Years of Clean Water Act Practice

UPCOMING 10/15: The Good, the Bad & the Biosolids: Carlisle’s Path to Class A

UPCOMING 10/22: Taking Back Control: Managing Cost and Risk Through Collaborative Delivery

Brown Receives 2026 George Warren Fuller Award From AWWA

In the News: WHCRWA Honors GFT’s Wayne Ahrens for 25 Years of Service

Abe Khademi, PEng

Amy Dziuk, PE, CFM










