Modern transit facility building with gray metal panel exterior, large angled windows, and ADA-accessible parking spaces in front under a clear blue sky.

Port Authority Transit Corporation Control Center Relocation

Client: Delaware River Port Authority
Our Role:  Architectural, Structural, MEP, Rail Systems, Communications

The Port Authority Transit Corporation (PATCO) system operates train service between the New Jersey suburbs and the City of Philadelphia, carrying 5.9 million riders annually out of 14 stations. To maintain customer service and system performance, PATCO needed a new train operations control center. The existing facility was more than four decades old and could not accommodate today’s technology and security needs in a sustainable and upgradeable manner. PATCO also wanted to ensure operational redundancy by maintaining the original center as a backup while relocating this operation to the new facility.

After completing a preliminary study with alternatives analysis, GFT provided complete design services for a new, leading-edge control center. Our work covered all systems, including architectural, structural, mechanical, power, display, controls, communications, safety, and security. The effort was carefully planned to keep the existing center in operation during construction, minimizing disruption to PATCO employees and rail passengers.

The new building’s architecture responds to two user groups that maintain separate operations, and the building’s plan responds to these two distinctly programmatic functions.

The main control center, located on the second floor, has an internally focused, computer-intensive environment. To ensure maximum functionality and comfort for the staff, the team conducted detailed studies of the ergonomic relationships between the computer screens. Views of a large display wall were optimized, and carefully configured consoles equipped with computers and monitors were incorporated into the design.

The team designed the center’s ground floor to serve as a base of operations for train conductors and management staff. Durable maintenance-free materials were used throughout the building, including masonry for the base and insulated metal panels for the second story, add to the structure’s strength and longevity.

Key Features

  • Materials in interior finishes meet a high sound-absorption coefficient to minimize noise.
  • An insulated, translucent skylight invites daylight into the control center to enhance the employee environment but is carefully designed to avoid screen glares on monitors from the natural light.
  • Features a dedicated centralized traffic control (CTC)/supervisory control and data acquisition (SCADA) isolated, secure, and high-bandwidth network.
  • Integration into PATCO’s existing and systemwide radio, video surveillance, access control, and public address systems.

Outcomes

  • Improved rail service for 5.9 million annual commuters.
  • Expected 50-year service life for the new control center.
  • Enhanced comfort and an efficient work environment for staff.

Featured Projects

Shape better lives with us.

Shape better lives with us.

Shape better lives with us.

What are you looking for?