Kearny, N.J.
Portal North Bridge Capacity Enhancement
Client: NJ TRANSIT
Our Role: Project Management, Operational Simulation Analyses, Quality Control, Geotechnical, Bridges, Rail Systems, Trackwork Design, Signals, Traction Power

A longtime source of delay on the Northeast Corridor, the aging Portal swing bridge over the Hackensack River is being replaced as part of the Portal Bridge Capacity Enhancement program. The effort rebuilds 2.5 miles of the Amtrak Northeast Corridor between Newark, New Jersey, and New York City, where Amtrak and NJ TRANSIT commuter trains share one of the busiest rail corridors in the country. The corridor carries 472 trains per day through the environmentally sensitive Hackensack Meadowlands.
In 2026, NJ TRANSIT and Amtrak achieved a major milestone by cutting over the first track to the new Portal North Bridge and beginning revenue service. Work continues toward full buildout and long-term reliability gains.
GFT leads the Portal Partners Tri-Venture team of 27 subconsultants supporting planning, design, and construction support across this critical section of the Northeast Corridor. Our scope includes project management, scheduling, rail operational simulation analysis, quality control, geotechnical design, trackwork, retaining walls, rail signaling, and traction power.
During construction, GFT serves as the engineer of record, reviewing submittals, responding to requests for information (RFIs), addressing nonconformance reports (NCRs), and supporting change order and estimate reviews in coordination with Amtrak review teams and the construction manager.
The project involves many organizations and multiple document control systems, requiring disciplined coordination and frequent communication to keep teams aligned with current information. Construction proceeds within a Superfund-contaminated site, which drives additional environmental and worker protection measures and close coordination with NJ TRANSIT environmental staff and remediation teams. Active rail operations also constrain outage availability and force account support, reinforcing the need for early and ongoing engagement from railroad operations teams and daily coordination forums.
Key Features
- Accelerated environmental impact statement effort with coordination among multiple stakeholders, including work tied to land acquisition, wetlands, contaminated sites, and landfills.
- Preliminary engineering to expand a two-track corridor to five tracks and elevate the alignment to support replacement of the swing bridge with fixed river crossings.
- Design of 29 bridges with 124 spans, plus associated civil, track, signal, catenary, and traction power substation work.
- Two three-span, network-tied arch river bridges providing 50 feet of clearance over the Hackensack River.
- “Duckunder” structure enabling westbound NJ TRANSIT trains leaving New York to pass under the Amtrak Northeast Corridor.
- Five new interlockings with staging designs, plus modifications to seven control centers for signal and traction power control.
- Rail network operations simulation modeling using rail traffic controller (RTC), including modeling of all 15 platform tracks at Penn Station New York for multi-day and multi-week scenarios and delay statistics across train types.
Outcomes
- Advanced a Gateway Program priority by shifting service off an aging movable bridge and onto a new fixed-span structure.
- Delivered staged corridor and interlocking designs that support continuous operations during construction.
- Improved delivery confidence through simulation-backed staging and coordinated control system updates across multiple operating stakeholders.
- Supported long-term corridor capacity and flexibility, including train sorting between Penn Station New York and planned future Hudson River tunnel connections.



Featured Projects

Port Authority Transit Corporation Control Center Relocation

Thornwood Crossing Connector, Roundabout & Bridge Replacement

Modernizing WMATA’s Backup Operations Control Center

High-Availability Data Center and Security Operations Control Center Design

Meadows Maintenance Complex Substation Design

Tradepoint Atlantic Berth Modernization Structural Design

Meadowlands Pedestrian Bridge Expansion at MetLife Stadium

Rehabilitation of Six Thunder Bay Structural Culverts

North Wilkesboro Speedway Pedestrian Bridge

Gambo Bridge Replacement at Naval Support Facility Dahlgren

Gardiner Expressway Section 5 Detailed Design

John Glenn Columbus International Airport Consolidated Rental Car Facility

San Antonio International Airport Consolidated Car Rental Facility

14th Street Station Complex Accessibility and Modernization

Garden State Parkway Shoulder Widening Milepost 30-35
Featured News & INSIGHTS
Replacing a Chicago Rail Bridge While Maintaining Continuous Service

Delivering Urban Light Rail Through Alternative Project Delivery

Engineering Ingenuity: Replacing Bridge A32 and Grayland Station in Urban Chicago
From Roadway to Rail Trail: Adaptive Reuse of the Mount Carbon Bowstring Truss
Scott Bennett Elected to ITS America Board of Directors

GFT Welcomes Fuller as Transit & Rail Global Business Line Director

John Bergman, PE

Walter Kutschke, PhD, PE