Potters Mills, PA
Potters Mills Gap Transportation Project
Client: Pennsylvania Department of Transportation (PennDOT) Engineering District 2-0
Our Role: Design

Potters Mills was a well-known bottleneck to travelers of U.S. Route 322 in Central Pennsylvania that connects Mifflin and Centre Counties. Increased traffic flows along the narrow and steep two-lane portion of U.S. 322 through the gap caused impactful safety concerns and traffic backups.
PennDOT Engineering District 2-0 selected GFT for project design and construction consultation for building the new 3.75-mile roadway, including adding four new bridges, inserting new retaining walls, and relocating a portion of the highway into the mountainside. Our firm managed the overall project, including highway and geotechnical design, permitting, and construction services.
The project replaces a winding section of U.S. 322, from west of the Pennsylvania Route 144 intersection to the Seven Mountains area near the Centre and Mifflin County line. The final design incorporated new interchanges at both ends of the corridor, widening the existing two-lane U.S. 322 highway to a four-lane limited access facility, and constructing a parallel frontage road (Pennsylvania State Route 2015).
Design challenges included fitting four mainline lanes and two frontage road lanes in the gap between the mountainside and Potter Run stream. To solve this complex problem, three large retaining walls and innovative stormwater management best practices, including ultra-extended detention basins, were built in the gap.
The roadway had several sharp curves and steep vertical grades ranging from just over 1% to over 8%. The highway’s alignment was carefully designed to meet current highway criteria, while minimizing impacts on the surrounding natural environment. The design team used the maximum allowable flexibility with vertical grades and horizontal curvature to conform the roadway as closely as possible to the topography. A bifurcated vertical alignment through the gap reduced the excavation height, excavation volume, and roadway footprint.
Most stream and wetland areas required compensatory mitigation alignment that minimized the impact on the surrounding forestlands and streams. This was accomplished with a bifurcated vertical alignment, retaining walls, and soil nailing. Thus, a new stream channel was created and is now an unnamed tributary to Potter Run. The stream design includes riffle beetle habitat structures (with embedded logs), floodplain benches, and minimized rock on the streambanks.
Key Features
- Four mainline lanes and two frontage road lanes in the gap.
- Three large retaining walls and ultra-extended detention basins.
- Four reconstructed bridges.
- New roundabout at the westbound off-ramp of Old Route 322.
Outcomes
- Improves safety, reduces congestion, and enhances mobility.
- Minimizes future maintenance with a 100-year structure design.
- Protects wildlife through enhanced stream and watershed restoration.

Featured Projects

Tradepoint Atlantic Berth Modernization Structural Design

Pennsylvania Turnpike Commission GeoBIM Implementation

San Antonio International Airport Consolidated Car Rental Facility

Ohio Statewide GIS Solutions Powered by Esri Technology

Merchants Bridge Main Span Truss Replacement & East Approach Retrofit
Featured News & INSIGHTS
How Tennessee DOT Modernized Work Zone Management Through an IT/OT Partnership

Beyond the Control Room: How Traffic Operations are Shaping Transportation Systems in Real Time

Engineering Ingenuity: Replacing Bridge A32 and Grayland Station in Urban Chicago
From Data to Decisions: Connecting BIM, GIS, and Infrastructure Intelligence

GFT Welcomes Fuller as Transit & Rail Global Business Line Director

GFT Facilitates Emergency Response Tech & Demo Day at ITS America 2026

Surbhi Kamboj, AICP, LEED AP

Kevin Burgess, PE