State of Washington
Priest Rapids and Wanapum Dam Safety Engineering Services
Client: Grant County Public Utility District
Our Role: Seismic, Stability, and Hydrologic Analyses

Grant County Public Utility District (GCPUD) operates the Wanapum and Priest Rapids Dams, two hydroelectric structures on the Columbia River. As the dam owner, GCPUD needed to meet rigorous Federal Energy Regulatory Commission (FERC) standards and ensure long-term performance. This required expert support to evaluate dam safety across structural, geotechnical, seismic, and hydrologic factors. The effort was a key element in protecting infrastructure, maintaining operations, and safeguarding public safety throughout the region.
Our firm delivered a holistic suite of dam safety engineering services tailored to each site’s unique challenges. We conducted extensive seismic, stability, and hydrologic analyses using industry-standard methods and finite element modeling. For both dams, we assessed critical structures, from powerhouses to fishways, developing seismic time histories and evaluating instrumentation systems.
At Priest Rapids Dam, our team supported spillway remediation efforts by conducting structural stability evaluations, facilitating potential failure modes analysis (PFMA) workshops, and producing FERC-approved design documentation. For the Priest Rapids Spillway Stability Improvement Project, we designed and documented a complete rehabilitation plan using post-tensioned anchor systems and enhanced understanding through a 3D-printed model for visual engagement.
Beyond engineering, we led seismicity and concrete structure analysis training for regional utility staff and supported a Level 3 risk assessment to guide risk-informed dam safety decisions. Our collaborative, integrated approach aligned with regulatory requirements and delivered lasting benefits for the dam owner and community. The work also honored the historical and cultural significance of the Wanapum people, whose name the dam bears.
Key Features
- Advanced seismic and hydrologic modeling, including time-history development and finite element analysis.
- PFMA and risk assessment facilitation with visual aids and stakeholder training.
- Design and documentation of post-tensioned anchor systems within 12 months.
Outcomes
- Strengthened dam stability under seismic and flood load scenarios.
- Enhanced risk awareness and decision-making for future infrastructure planning.
- Improved community safety and regulatory confidence through rapid, integrated, and cost-effective solutions.




Featured Projects

Houston Area Water Supply System Program Management

Palos Verdes Recycled Water Pipeline and Lago Seco Pump Station Design

Valley Center North County Emergency Water Storage Project

Priest Rapids and Wanapum Dam Safety Engineering Services

Rehabilitation of Six Thunder Bay Structural Culverts

Gambo Bridge Replacement at Naval Support Facility Dahlgren

Risk-Informed Decision-Making at Union Valley Dam

Orange County Coastal Storm Program Management

Garden State Parkway Shoulder Widening Milepost 30-35
Featured News & INSIGHTS
Searching for Water: Engineering Solutions for the Colorado River’s Survival

Vertical Hydropower Unit Alignment: The Key to Bearing Health and Long-Term Reliability

The Good, the Bad & the Biosolids: Carlisle’s Path to Class A

Rethinking Flood Risk: Identifying and Reducing Impacts Without Dams

In the News: Tackling Utility Emergency Preparedness With Whole-Community Resilience

In the News: WHCRWA Honors GFT’s Wayne Ahrens for 25 Years of Service

Abe Khademi, PEng

Amy Dziuk, PE, CFM




