Audubon, PA
Professional Services Office Modernization
Client: GFT
Our Role: Architecture, Space Planning, Construction Administration

A legacy workspace gave way to a bold new vision as GFT reimagined its Valley Forge office, reducing the footprint by nearly two-thirds to create a more agile and collaborative environment with a floor plan designed for efficiency. This interior architecture office renovation project reflects GFT’s commitment to flexible, digital-forward workflows, replacing high-partition cubicles, perimeter offices, and fragmented support spaces with an open, connected design that promotes circulation, collaboration, and creativity. The result is a right-sized, visually engaging functional space that supports hybrid work while reinforcing GFT’s culture of innovation and adaptability.
GFT’s in-house designers worked to transform 21,000 square feet of outdated office space into a modern, efficient workplace through efficient space planning. The redesign centered on a new central spine of shared interior spaces such as the kitchen, conference rooms, storage, and printer areas. Two open office zones flank these spaces to create a streamlined layout and enhance accessibility. The design team, which included an interior designer, relocated private offices to the interior to allow daylight to reach workstations and common areas. Skylights along circulation paths were preserved and diffused with new ceiling textures to promote intuitive navigation.
To further improve programmatic efficiency, workstations were organized into four-person clusters, using strategic openings that preserved Americans with Disabilities Act (ADA) accessibility while reducing aisle widths. Circulation routes double as collaboration zones —notably in the breakroom spine — maximizing spatial utility.
A series of varied ceiling heights creates volume changes that enhance spatial definition, guiding users through compressed and expanded zones that signal function and flow. Suspended acoustic baffles reinterpret the existing skylights, modulating daylight into dynamic patterns of light and shadow, especially across the entry lounge and library.
During development, the design team used a virtual reality (VR) model to test spatial relationships and address material coordination, increasing accuracy and reducing construction cost risks. Following 100% design completion, the team implemented a targeted value engineering phase to meet budget constraints without compromising design integrity.
Key Features
- Optimized footprint and daylight access to support long-term sustainability.
- Flexible open concept with approximately 90 workstations.
- 28 private offices, six phone booths, and three conference rooms.
- Centralized collaboration spine with kitchen and multipurpose library.
- Skylight integration and diagonal custom acoustic ceiling baffles to improve lighting and wayfinding through primary corridors.
- Volume changes through varied ceiling heights to define living area zones.
- Custom wall features at the entry and break room for visual identity.
- Inviting guest seating area at the entrance for informal meetings.
- Material finishes that signal spatial function: soft carpet in work areas, warm wood flooring in collaboration zones, and durable luxury vinyl tile (LVT) in circulation paths.
Outcomes
- Improved access to daylight, acoustic comfort, and spatial clarity support staff well-being throughout the workday.
- Positive user feedback noting increased comfort, connectivity, and creative energy.
- Flexible layout that maximizes utility and spatial comfort within a smaller footprint.
- A refined, contemporary interior identity achieved through thoughtful material layering and a cohesive color palette.
- Despite a tight schedule and budget realignment, the project exceeded design benchmarks and delivered a high-performing workplace experience.
Featured Projects

P.S. 341Q Brings Flexible, Resilient Learning Spaces to Hunter’s Point

P.S. 47Q Chris Galas School Modernization and Expansion

Port Authority Transit Corporation Control Center Relocation

Military Maintenance Facility for the Maryland Army National Guard

Modernizing WMATA’s Backup Operations Control Center

High-Availability Data Center and Security Operations Control Center Design

Meadows Maintenance Complex Substation Design

Dunkirk Park Tennis Complex Design and Site Engineering

Meadowlands Pedestrian Bridge Expansion at MetLife Stadium

New Delaware State Police Troop 6 Headquarters

14th Street Station Complex Accessibility and Modernization
Featured News & INSIGHTS
Photo Story: Inside the SEPTA 30th Street Station Modernization Project

Water Asset Prioritization: Harnessing Data to Streamline Infrastructure Management

An Inside Look at SEPTA’s 30th Street Station Transformation

In The News: CPBJ Names Lake Williams Dam Rehabilitation a 2025 Top Project

ACEC Recognizes GFT, Clients With 15 Engineering Excellence Awards

Ray Everett, AIA

Cathy Otis, AIA, NCARB