Ontario
Queen Elizabeth Way (QEW) Highway Rehabilitation
Client: Ministry of Transportation Ontario
Our Role: Design and Contract Preparation Services

MTO retained GFT to provide detailed design and contract preparation services for rehabilitating approximately 7 kilometers of the QEW from Seventh Street to Niagara Street through downtown St. Catharines, Ontario, going over the Henley Bridge and connecting with King’s Highway 406 that leads to Highway 58, the Welland Canal, and the QEW Glendale Avenue York Road Diverging Diamond Interchange.
Our work also includes rehabilitating:
- Interchange ramps.
- Crossing roads.
- Adjacent service roads that are owned and maintained by the Ministry.
The project’s goals are to eliminate driving surface deficiencies, improve safety, and increase overall ride quality through the critical highway corridor while alleviating construction traffic congestion. Our specific tasks include:
- QEW highway interchange design planning.
- High-speed highway staging and traffic analytics.
- Electrical upgrades at traffic signals, counting stations, and replacing existing high-mast lighting support cables across the highway.
- Visual structural assessment of all bridges through the corridor.
- Active transportation review through grade-separated interchange areas.
- Stormwater management assessment and design.
- Environmental fieldwork and reporting.
- Geotechnical fieldwork, lab work, and design for composite and flexible pavement rehabilitation.
- Topographic survey of the project corridor.
Project challenges include the highway’s heavy traffic volumes, especially during the summer tourist season, around Niagara Falls and Niagara on the Lake. Annual average daily traffic analysis shows spring as the best season for longer-term lane closures needed for the composite concrete slab repairs due to salt corrosion from Canada’s harsh winters.
Key Features
- Rehabilitated QEW.
- Rehabilitated interchange ramps and crossing roads.
- Composite pavement rehabilitation design involving full-depth concrete base repairs.
- Upgraded traffic signals, counting stations, and lighting.
Outcomes
- Smoother driving surfaces.
- Improved safety and increased overall ride quality.
- Increased service life for the existing pavement structure.
- Reduced future maintenance work and costs on QEW.
For all media inquiries, please contact mto.media@ontario.ca.
Featured Projects

Environmental Assessment and Detailed Design for Stevenson Road North Corridor

Rehabilitation of Six Thunder Bay Structural Culverts

Gardiner Expressway Section 5 Detailed Design

Scarborough Subway Extension & Yonge North Subway Extension Projects

Burlington Canal Lift Bridge – Lift Span Deck Replacement

Queen Elizabeth Way (QEW) Highway Rehabilitation

Ontario Highway 401 Resurfacing & Road Bridge Rehabilitation

Region of Peel Airport Road Widening
Featured News & INSIGHTS
Transportation Solutions for Northern Ontario

What You Should Know: Digging Into Ontario’s Excess Soil Regulation and Reporting Changes

UPCOMING 12/10: Managing Geohazard Risk for Critical Infrastructure Projects
Designing Airport Vertical Transportation for Uptime, Not Just Code

GFT Expands Canadian Infrastructure Leadership to Support Major Transportation Programs

GFT Names Sharon Berger Transit and Rail Major Projects Group Leader

Abe Khademi, PEng

Salvatore “Sal” Costanzo