Peel, Ontario
Region of Peel Airport Road Widening
Client: Regional Municipality of Peel, Ontario
Our Role: Design and Contract Administration

Airport Road is a major urban transportation corridor named after its proximity and connection to Toronto Pearson International Airport at its southern limits. Also designated as Peel Regional Road 7, it provides an important route for commuters and other residential areas in the cities of Brampton and Mississauga in the Greater Toronto Area.
The road passes through industrial, commercial, and residential areas, providing connections to shopping centers, hotels, restaurants, and other amenities. Airport Road must be widened from four to six lanes to accommodate current and future traffic demand caused by continued growth in the Region of Peel and the city of Brampton.
The Region of Peel has retained GFT to provide detailed design, contract preparation, and construction administration services for a road bridge rehabilitation project that widens Airport Road from Braydon Boulevard to Countryside Drive in the city of Brampton. The corridor features a melting pot of stakeholders, including:
- The city of Brampton.
- Environmental agencies.
- Transit agencies.
- Residents and businesses.
- Developers.
- Third-party utility companies.
Our team is collaborating with all project stakeholders to ensure their ideas are addressed in developing balanced solutions.
One key project aspect is to minimize impacts during construction by providing connectivity for all transportation modes through staging operations, including:
- General vehicles.
- Heavy vehicles.
- Buses.
- Pedestrians.
- Cyclists.
- Those with accessibility needs.
Our team will also work diligently to maintain access to all residential, commercial, and other amenities through the corridor during project construction.
Our design includes a low-impact development (LID) plan to meet stringent regional and regulatory requirements for predevelopment hydrology management practices within a developed roadway corridor. These LID practices include linear and centralized facilities, including bioswales, infiltration trenches, and enhanced grass swales in the existing drainage network.
Key Features
- Expands roadway from four to six lanes.
- Uses a LID plan to meet stringent regional and regulatory requirements.
- Construction staging keeps traffic flowing and businesses open.
Outcomes
- Improved transportation operations through the addition of two traffic lanes in each direction.
- Enhances general streetscape environment for all transportation modes.
- Improves safety for all road users.
- Innovative design and collaboration with environmental agencies minimize impacts on the natural environment.

Featured Projects

Environmental Assessment and Detailed Design for Stevenson Road North Corridor

Rehabilitation of Six Thunder Bay Structural Culverts

Gardiner Expressway Section 5 Detailed Design

Scarborough Subway Extension & Yonge North Subway Extension Projects

Burlington Canal Lift Bridge – Lift Span Deck Replacement

Queen Elizabeth Way (QEW) Highway Rehabilitation

Ontario Highway 401 Resurfacing & Road Bridge Rehabilitation

Region of Peel Airport Road Widening
Featured News & INSIGHTS
Replacing a Chicago Rail Bridge While Maintaining Continuous Service

Quantitative Risk Assessments to Strengthen Resilience Across Infrastructure Systems

Quantifying the Unknown Part 2: Transforming Risk into Resilience

Quantifying the Unknown Part 1: Advancing All-Hazards Risk and Resiliency Assessments

Scott Bennett Elected to ITS America Board of Directors

In the News: GFT’s Interstate 5 Reconstruction Project Featured in Roads & Bridges Magazine

Kevin Burgess, PE

Deanne Winkelmann, AICP







