Shrewsbury, PA
Renovation of I-83 Diverging Diamond Interchange
Client: Pennsylvania Department of Transportation
Our Role: Preliminary Engineering, Final Design, and Construction Consultation

GFT provided preliminary engineering, final design, and construction consultation for the Interstate 83 (I-83) Exit 4 highway project, which upgraded the existing interchange with PA 851. The interchange area has grown extensively, causing high traffic congestion levels and backups onto I-83. Also, the bridges carrying I-83 traffic over PA 851 were structurally deficient, and the adjacent culvert needed to be replaced. Designing an innovative diverging diamond interchange (DDI) and replacing a culvert adjacent to environmentally sensitive lands highlight the many resourceful features of this “Gateway to Pennsylvania” themed interchange, the first exit for visitors to Pennsylvania traveling northbound on I-83.
The I-83 Exit 4 project is the third DDI built in the commonwealth. Instead of a traditional diamond interchange, the project’s DDI configuration allows vehicles to turn left directly from off-ramps onto PA 851 and from PA 851 to on-ramps onto I-83, eliminating backups. Direct left turns reduce the number of intersection conflict points from 26 in a traditional diamond configuration to 14, which is expected to reduce the crash rate by more than 40%. The DDI has only two phases per traffic signal cycle instead of three, allowing increased capacity and more green time per cycle than a standard diamond interchange configuration to improve traffic flow.
The project team coordinated with the Shrewsbury Wellhead Protection Committee during both design and construction to provide a stormwater management system that would protect the nearby local public water supply. Basin lining and outlet valves were included in the design for spill containment, preventing roadway runoff from infiltrating groundwater in the Deer Creek watershed. Water quality testing was performed before, during, and after earthmoving and pile driving activities.
As a “Gateway to Pennsylvania,” special considerations were made to the Exit 4 interchange landscaping and aesthetics. The project included dry stack stone retaining walls reminiscent of those constructed on nearby farms in the colonial era that support red stone beds filled with seasonal plants. A flagpole with American and Pennsylvania flags was installed in the southeast quadrant, which accompanies artwork placed on the bridge abutments: a 5-foot by 5-foot Liberty Bell and “Life, Liberty, and the Pursuit of Happiness” graphic. Both the flags and artwork are illuminated at night, providing a visual statement in daylight and darkness.
Key Features
- Improved safety through a 46% reduction of intersection conflict points and lengthening of the exit and entrance ramps.
- Reduced congestion with a DDI that more efficiently moves traffic through the interchange.
- Replaced a structurally deficient bridge and culvert.
- Provides a safe passage for pedestrians and bicyclists.
- Aesthetic features that beautify the interchange and welcome visitors to Pennsylvania.
Outcomes
- Makes complex scientific concepts accessible to diverse audiences.
- ASHE Northeast Region, 2023 Project of the Year Award.
- ASHE Harrisburg, 2022 Project of the Year.
- ACEC/PA 2022 Diamond Awards Winner: Transportation Category.
- ACEC 2022 Engineering Excellence Awards: National Recognition Award.
Featured Projects

High-Availability Data Center and Security Operations Control Center Design

Meadows Maintenance Complex Substation Design

Tradepoint Atlantic Berth Modernization Structural Design

Pennsylvania Turnpike Commission GeoBIM Implementation

Garden State Parkway Shoulder Widening Milepost 30-35

Harry W. Nice/Thomas “Mac” Middleton Bridge Replacement

NREL EV Infrastructure Design and Siting Assessment Tool

Purple Line Light Rail Transit Project

WMATA Resilience Program Development, Phase 2

Route 252 Springton Reservoir Dam Spillway Bridge Improvements

Lehigh Valley SR 0100 Roadway Reconstruction

Final Design for Pittsburgh Regional Transit BRT

Nassau Inter-County Express Battery Electric Bus Charging
Featured News & INSIGHTS
Leveraging the Power of Bridge Condition Assessments

Rehabilitation of the Route 139 Hoboken Viaduct: A Case Study in Accelerated Bridge Construction

Bridging the Gap: Innovative Bridge Condition Assessment for WMATA

GFT, Clients Honored with 2026 ACEC Engineering Excellence Awards

ACEC Recognizes GFT, Clients With 15 Engineering Excellence Awards

Elliott Plack

Tao Xue, PE