Phoenix, AZ
Replacement of Terminal 3 Escalators at PHX
Client: City of Phoenix, AZ
Our Role: Equipment Audit, Technical Guidance, Structural Loading Review

Thousands of passengers rushing to catch their flights pass through Phoenix Sky Harbor International Airport’s Terminal 3 each day. The terminal’s four escalators operate 24/7 to help commuters move quickly through the terminal. GFT’s vertical transportation specialists developed a design-build modernization program to maintain the aging escalators’ safety and reliability.
Using detailed inspections and field surveys, GFT developed a steering document to determine whether overhaul, modernization, or replacement would be the best option for the escalators. A passenger-load study evaluating traffic conditions on the escalators augmented the needs analysis. GFT developed qualification criteria and technical requirements to identify design-build firms to execute the modernization project, based on team/supplier qualifications and equipment design features.
The firm worked closely with the design-build team to monitor compliance with critical schedule requirements and to optimize equipment performance. Detailed equipment inspections performed at the factory prior to shipment, throughout installation, and at turnover ensured equipment quality. Lastly, the firm reviewed structural loading throughout demolition and installation and provided oversight compliance with critical schedule requirements to minimize interruptions to travelers.
Key Features
- Custom $2 million artwork within escalator wellway was protected throughout construction.
- Work scheduled around peak travel times to avoid delays.
Outcomes
- Modernization program maintains peak performance of escalators.
Featured Projects

SEA Airport Temporary Holdroom Annex Design Study

Fresno Area Express (FAX) Zero-Emission Bus Transition

Inglewood Transit Connector Engineering and Design

City of Surprise Public Works Operations Facility

Bay Area Rapid Transit Transbay Tube Seismic Retrofit

Valley Metro Rail Operations and Maintenance Center Expansion

Phoenix Sky Harbor International Airport (PSHIA) Crossfield Taxiway U Design Development

Gage Avenue Over Los Angeles River Bridge Replacement Project

East San Fernando Valley Light Rail Transit Project

Replacement of Terminal 3 Escalators at PHX

Phoenix Sky Harbor International Airport Terminal 3 Modernization – Phase 1

PHX Sky Train Stage 2 Automated People Mover System
Featured News & INSIGHTS
Delivering Urban Light Rail Through Alternative Project Delivery

East San Fernando Valley LRT: Enhancing Regional Mobility & Connectivity Using Alternative Project Delivery
ACEC Recognizes GFT, Clients With 15 Engineering Excellence Awards

Gannett Fleming TranSystems Changes Name to GFT and Appoints Mike Orth as Chief Executive Officer

William Peterson, PE, LEED AP, ENV SP, CBSI

Stephanie Templeton, PE