El Dorado County, CA
Risk-Informed Decision-Making at Union Valley Dam
Client: Sacramento Municipal Utility District
Our Role: Risk Analysis

Union Valley Dam, a 453-foot-high earthfill embankment owned by the Sacramento Municipal Utility District (SMUD), plays a vital role in water management and hydroelectric power east of Sacramento, California. As part of the Federal Energy Regulatory Commission (FERC) 10-year comprehensive review process, SMUD completed a comprehensive assessment in 2023. This analysis identified top risk contributors, each carrying significant uncertainty due to limitations in available data. SMUD needed a transparent, defensible strategy to prioritize risk reduction efforts while navigating uncertainty, regulatory complexity, and public safety.
GFT is leading a targeted risk assessment using FERC’s risk-informed decision-making (RIDM) framework, an approach that integrates quantitative risk data with expert judgment, operational context, and uncertainty analysis. Unlike purely risk-based decision-making, which ranks hazards numerically, RIDM balances risk data, engineering experience, uncertainty analysis, and practical design thresholds to guide decisions that make the dam as safe as realistically and economically possible.
In collaboration with FERC, the California Division of Safety of Dams, the U.S. Army Corps of Engineers, Sacramento Area Flood Control Agency, and the Bureau of Reclamation, our team is evaluating all credible potential failure modes and developing a suite of actionable risk reduction measures. These include structural modifications, emergency planning enhancements, and further analytical studies. We will combine these into implementable risk reduction alternatives, giving SMUD a strategic path forward to reducing uncertainty, enhancing dam safety, and aligning with regional standards.
The project demonstrates how RIDM empowers dam owners to make clear, community-minded decisions that withstand technical, regulatory, and public scrutiny, supporting both resilience and transparency.
Key Features
- Applying FERC’s RIDM framework to balance quantitative risk with expert judgment.
- Delivering a collaborative, multi-agency risk assessment.
- Developing clear, prioritized risk reduction alternatives for immediate and future action.
Outcomes
- Enabling SMUD to make transparent, defensible decisions aligned with regional safety priorities.
- Advancing community safety through strategic, targeted risk reduction.
- Providing a replicable RIDM model for other dam owners facing uncertainty and regulatory complexity.
Featured Projects

Palos Verdes Recycled Water Pipeline and Lago Seco Pump Station Design

Valley Center North County Emergency Water Storage Project

Priest Rapids and Wanapum Dam Safety Engineering Services

Rehabilitation of Six Thunder Bay Structural Culverts

Gambo Bridge Replacement at Naval Support Facility Dahlgren

Risk-Informed Decision-Making at Union Valley Dam

Orange County Coastal Storm Program Management

Garden State Parkway Shoulder Widening Milepost 30-35

Ohio Statewide GIS Solutions Powered by Esri Technology
Featured News & INSIGHTS
Searching for Water: Engineering Solutions for the Colorado River’s Survival

How Updated Data and Regional Detention Are Reducing Flood Risk in Texas

The Good, the Bad & the Biosolids: Carlisle’s Path to Class A

Rethinking Flood Risk: Identifying and Reducing Impacts Without Dams

In the News: Tackling Utility Emergency Preparedness With Whole-Community Resilience

In the News: WHCRWA Honors GFT’s Wayne Ahrens for 25 Years of Service

Abe Khademi, PEng

Amy Dziuk, PE, CFM






