11 locations in four states
Security Improvements at Various Amtrak Stations
Client: G4S Technology LLC
Our Role: Security System Design

Embracing the national and global trend to improve homeland security, combat terrorism, and secure infrastructure, Amtrak utilized the American Recovery and Reinvestment Act (ARRA) funds to enhance security systems at 11 locations in the mid-Atlantic that collectively serve millions of people each year.
To meet an aggressive schedule imposed by U.S. Congress as part of the ARRA requirements, the team adopted a design-build project delivery approach and completed the security installation within 11 months and $3 million under budget; a traditional design-bid-build approach would have taken nearly twice as long. Work included the installation of 600 security cameras, electronic entry control, and physical access control elements such as bollards, fencing, and gating.
The project team defied numerous project obstacles – including various interests from Amtrak, management and police, unions, consulting firms, state historic preservation organizations, and the federal government – to accomplish the mission using the design-build project delivery method.
The technical achievement of the project spans the spectrum of electrical engineering, rail transportation, and security expertise. Dedicated teams of more than 100 people representing varying expertise worked concurrently at each project site to make 15 preliminary designs a reality.
Key Features
- Installation of more than 600 security cameras.
- Electronic access control and intrusion detection systems.
- Conventional, infrared, and thermal imagining technologies.
- Bollards, fencing, and gating.
Outcomes
- Upgraded security systems at 11 locations in the MidAtlantic.
- Completed on a fast-track 11-month schedule.
- Distinguished Award, 2013, American Council of Engineering Companies of New Jersey, Engineering Excellence Awards.
Featured Projects

Port Authority Transit Corporation Control Center Relocation

Modernizing WMATA’s Backup Operations Control Center

High-Availability Data Center and Security Operations Control Center Design

Meadows Maintenance Complex Substation Design

VRE Manassas Park Station Parking Expansion

Maryland Adopt-A-Highway Program Modernization

Pennsylvania Turnpike Commission GeoBIM Implementation

Gambo Bridge Replacement at Naval Support Facility Dahlgren

NREL EV Infrastructure Design and Siting Assessment Tool
Featured News & INSIGHTS
Leveraging the Power of Bridge Condition Assessments

Photo Story: Inside the SEPTA 30th Street Station Modernization Project

GFT, Clients Honored with 2026 ACEC Engineering Excellence Awards

In The News: GFT Named COMTO Northern California’s 2025 Corporation of the Year

Kandace Jennings, PMP, RIMS-CRMP

Elliott Plack