Tampa, FL
Skyway Wave Attenuation Design-Build
Client: Vecellio & Grogan, Inc./Florida Department of Transportation – District 1
Our Role: Prime Designer & Engineer of Record

The Florida Department of Transportation (FDOT), District 1, faced an urgent challenge: protecting the existing seawalls along the South Fishing Pier’s access road at the Skyway Bridge from persistent wave energy and erosion. With Tampa Bay’s dynamic marine environment, FDOT needed a long-term solution to prevent damage to the recently repaired seawall and roadway while maintaining the ecological health of the surrounding waters. The project required the design and construction of two breakwaters—measuring 1,180 feet and 1,512 feet in length—that could attenuate at least 70% of wave energy while supporting future seagrass mitigation efforts.
Our team served as the prime designer and engineer of record for this innovative design-build project. Through close collaboration with FDOT, we developed, permitted, and constructed two breakwaters using state-of-the-art Wave Attenuating Devices (WADs)—a first-of-its-kind application for any state or federal agency in the U.S. These structures offer a faster, more cost-effective, and environmentally sustainable alternative to traditional breakwater designs.
Key Features
- Wave Energy Reduction: The strategic placement of 8.5’ and 10.5’ WADs provided a highly effective barrier against wave energy, exceeding the project’s minimum attenuation requirements.
- Erosion Control & Infrastructure Protection: By mitigating wave action, the breakwaters safeguard the seawall and fishing pier access road, ensuring long-term stability.
- Environmental Benefits: The WADs promote the growth of marine life and seagrass, contributing to ecological restoration efforts in Tampa Bay.
- Durability & Sustainability: Designed to withstand the harsh marine environment, the WADs enhance coastal resilience while minimizing maintenance needs.
Outcomes
This project not only delivered an innovative coastal protection system but also set a new standard for sustainable marine infrastructure. By pioneering the use of WADs in a major transportation project, our team provided FDOT with a solution that safeguards critical infrastructure while supporting environmental conservation efforts.
- Long-Term Infrastructure Resilience: The breakwaters effectively prevent erosion, protecting roadway and seawall integrity.
- Environmental Stewardship: The design fosters marine habitat growth, contributing to Tampa Bay’s ecological health.
- Innovation in Coastal Engineering: Establishes a precedent for using WADs in future state and federal coastal protection projects.
- American Council of Engineering Companies (ACEC) Florida, 2024, Engineering Excellence Awards, Grand Award Winner
- American Council of Engineering Companies (ACEC) Florida, 2024, Outstanding Environmental Project Award
- American Council of Engineering Companies (ACEC), 2024, National Engineering Excellence Award
Featured Projects

Environmental Assessment and Detailed Design for Stevenson Road North Corridor

Thornwood Crossing Connector, Roundabout & Bridge Replacement

High-Availability Data Center and Security Operations Control Center Design

Meadows Maintenance Complex Substation Design

Tradepoint Atlantic Berth Modernization Structural Design

Rehabilitation of Six Thunder Bay Structural Culverts

North Wilkesboro Speedway Pedestrian Bridge

Gambo Bridge Replacement at Naval Support Facility Dahlgren
Featured News & INSIGHTS
How Tennessee DOT Modernized Work Zone Management Through an IT/OT Partnership

Delivering Urban Light Rail Through Alternative Project Delivery

From Work Zone to Smart Zone: A Real-World IT/OT Partnership Story

Rerouting the Rails: Unlocking Capacity at America’s Busiest Interlocking

In the News: Tackling Utility Emergency Preparedness With Whole-Community Resilience

Wu Ying Honored at 2026 Texas Innovation Invitational

William Peterson, PE, LEED AP, ENV SP, CBSI

Deanne Winkelmann, AICP