Miami-Dade Co, FL
South District Wastewater Treatment Plant Injection Well
Client: Miami-Dade Water and Sewer Department
Our Role: Construction Management

GFT is a subconsultant to Jacobs embedded in the program team providing qualified project managers, construction managers, and technical staff during the implementation of the OOL program.
As part of the South District Injection Well Project, the GFT team participated in the procurement process and evaluation of the drilling contractors. The team collaborated with the program team and client to develop front end documents, manage the bidding process addenda and request for information, and supported review of the responsive bids.
During the construction phase, GFT is leading the construction management for the South District WWTP injection wells. These consist of drilling three 24-inch diameter steel casing injection wells, each with capacities of 18.6 million gallons per day. The construction involves a series of telescoping casing, including 64-inch pit casing, 54-inch surface casing, 44-inch and 34-inch intermediate casings, and the 24-inch final casing. The final injection well casing is anticipated to be set approximately 3,200 feet below, once the boulder zone is reached. The construction manager (CM) is responsible for managing the construction contract with Youngquist Brothers, Inc., and coordination with the designer and team of hydrogeologists in the field. The CM also is responsible for ensuring contract terms and schedule, performance of required testing during construction, appropriate documentation, and the following of health and safety protocols. This project is partially funded by the American Recovery and Reinvestment Act of 2009, thus requiring a higher level of reporting for maintaining compliance requirements.
Key Features
- Use of e-Builder platform for document control.
- Collaboration and cooperation with team members from multiple organizations, ongoing projects, programs, and WWTP stakeholders to ensure success of the project.
- Management of expedited contractor schedule.
Outcomes
- Increase effluent disposal capacity to meet projected peak flows and improve hardening and resiliency for the South District Wastewater Treatment Plant.
- Meet established milestones for the Ocean Outfall Legislation Compliance Plan.
- Manage and document construction of the project in compliance with federally funded requirements under the American Recovery and Reinvestment Act of 2009.
Featured Projects

Long-Term Control Planning and GIS Mapping for Hazleton Sewer System

Houston Area Water Supply System Program Management

Emergency Structural Repairs Restore X425 Bronx School Pool

Palos Verdes Recycled Water Pipeline and Lago Seco Pump Station Design

Valley Center North County Emergency Water Storage Project

Illinois’ Central Tri-State Tollway (I-294) Reconstruction

Modernizing WMATA’s Backup Operations Control Center

High-Availability Data Center and Security Operations Control Center Design

VRE Manassas Park Station Parking Expansion

New York City’s Sotomayor Houses Comprehensive Upgrade

Center Street Water Treatment Plant Upgrade

Harry W. Nice/Thomas “Mac” Middleton Bridge Replacement

CREATE P3 Forest Hill Flyover Bridge and 71st Street Grade Separation

BNSF Alliance Intermodal Facility Expansion

Lake DeForest Water Treatment Plant Upgrade and PFAS Removal Design

Ocean Outfall Legislation Program and Construction Management Services

Wastewater Consent Decree Program Management and Construction Management Services
Featured News & INSIGHTS
Searching for Water: Engineering Solutions for the Colorado River’s Survival

How to Negotiate NPDES Permit Limits: Lessons From 40 Years of Clean Water Act Practice

UPCOMING 10/15: The Good, the Bad & the Biosolids: Carlisle’s Path to Class A

UPCOMING 10/22: Taking Back Control: Managing Cost and Risk Through Collaborative Delivery

Brown Receives 2026 George Warren Fuller Award From AWWA

In the News: WHCRWA Honors GFT’s Wayne Ahrens for 25 Years of Service

John Sadler, PE

Yovani Zelaya, PE