Palmyra, PA
SR 422 Emergency Sinkhole Repair
Client: Pennsylvania Department of Transportation, District 8-0
Our Role: Design

When a large sinkhole closed SR 422 in Palmyra, Pennsylvania, causing hardship for the local economy and delays for 16,000 daily motorists, the Pennsylvania Department of Transportation (PennDOT), District 8-0 responded by quickly initiating an emergency remediation project. Working through the July 4th holiday, PennDOT and GFT engineers developed an innovative solution to support a rebuilt roadway over the sinkhole-prone limestone soil.
The design and construction of a 280-foot-long, 2-foot-deep slab supported by 84 micropiles enabled PennDOT to safely reopen SR 422 just 18 weeks after its closure. Because of the team’s prompt action, travel time for commuters quickly returned to normal, and local businesses were able to reopen. The innovative solution was designed to enable the monitoring of subsequent ground movements, facilitating quick action to address future concerns.
Varying in length because of the variability of limestone depths and the presence of voids, the micropiles were drilled into competent bedrock as deep as 180 feet. To protect against future sinkholes, redundancy was achieved by designing the slab so that one pile could be missing at any location with the slab spanning that distance. A 3D GIS model of the proposed site activities communicated anticipated drilling depth and provided micropile status during construction.
Inspection ports in the slab allow PennDOT to monitor the effect of future belowground movement on the foundation system. Cameras lowered into these ports every six months capture potential problems, enabling quick responses to any voids under the slab. A time-lapse camera documented site activity, while biweekly drone photography created panoramic aerial photos of the project site, enhancing public outreach. The innovative solution provides a design that can be monitored, minimizes disruptions to travel, and provides long-term protection against future closures.
Key Features
- Slab supports roadway over sinkhole-prone karst limestone formations.
- Micropiles drilled into competent bedrock securely support roadway slab.
- 3D GIS model effectively communicated anticipated drilling depths for secure micropile installation.
- Inspection ports enable long-term monitoring of future belowground movements.
Outcomes
- Long-term solution to highway closures caused by persistent sinkholes.
- Safely restored travel for 16,000 motorists every day.
- Minimal disruption to area traffic and local businesses.
- Grand Conceptor Award, 2021, American Council of Engineering Companies (ACEC) Pennsylvania, Engineering Excellence Awards.
- #10 Road, 2020, Roads & Bridges, Top 10 Roads.
Featured Projects

Thornwood Crossing Connector, Roundabout & Bridge Replacement

Meadows Maintenance Complex Substation Design

Tradepoint Atlantic Berth Modernization Structural Design

Rehabilitation of Six Thunder Bay Structural Culverts

North Wilkesboro Speedway Pedestrian Bridge

Gambo Bridge Replacement at Naval Support Facility Dahlgren

Gardiner Expressway Section 5 Detailed Design

Garden State Parkway Shoulder Widening Milepost 30-35

Harry W. Nice/Thomas “Mac” Middleton Bridge Replacement

Houbolt Road Extension and Diverging Diamond Interchange (DDI)
Featured News & INSIGHTS
Replacing a Chicago Rail Bridge While Maintaining Continuous Service

Delivering Urban Light Rail Through Alternative Project Delivery

From Roadway to Rail Trail: Adaptive Reuse of the Mount Carbon Bowstring Truss
From Work Zone to Smart Zone: A Real-World IT/OT Partnership Story

In the News: GFT’s Interstate 5 Reconstruction Project Featured in Roads & Bridges Magazine

GFT Helps Lead the Conversation at IBC 2026

William Peterson, PE, LEED AP, ENV SP, CBSI

Kevin Burgess, PE