Miami-Dade County, FL
Strategic Miami Area Rapid Transit (SMART) Program
Client: Florida Department of Transportation – District 6
Our Role: Architectural Design

The Florida Department of Transportation (FDOT) – District 6, in Miami, Florida, has been supporting the Strategic Miami Area Rapid Transit (SMART) Program that will enhance the region’s public transportation system, bringing a high-quality bus rapid transit (BRT) project, along with automated guideway, commuter rail, and heavy rail transit.
Under the organization’s leadership, and in cooperation with the Miami-Dade County Department of Transportation and Public Works (DTPW), a program of public transit projects is advancing, built upon best practices and lessons learned from past efforts.
GFT is the owner’s representative for the six corridor study of premium transport across Miami-Dade County, consisting of three corridors being led by FDOT and three corridors being led by DTPW. Our scope includes reviewing all:
- Engineering.
- Architecture.
- Travel demand forecasting.
- Environmental studies.
- Public involvement.
- Budget and schedule management.
- Overall quality and program management.
We considered a series of transit alternatives, including elevated and at-grade heavy rail, commuter rail, automated guideway transit, light rail transit/modern streetcar, and BRT. Each corridor is currently under consideration for federal funding, and the scope of work conforms to Federal Transit Administration requirements for new starts.
Principle tasks include:
- Maintaining coordination and consistency on approach, methodologies, and engineering standards between all corridors.
- Developing guidelines and standards for unique features and technologies, including at-grade rail alternatives and transit station design.
- Managing a coordinated public outreach program that informs the affected public and invites community input.
- Establishing operational standards and systemwide routing and scheduling.
- Organizing and leading working sessions with the various corridor project teams to establish standards for systemwide rail operations, transit station configuration, and unique street-running rail operations.
- Liaising with partner agencies, elected officials, governing boards, and state and federal officials.
One of the project’s unique aspects was the concept of running Metrorail vehicles in the center and at-grade along existing highways. Our team developed appropriate traffic management and safety features across all transit corridors to enable a one-seat ride throughout the system.
The project is also establishing the statewide standards for BRT system operations, including station design and roadside features that facilitate efficient bus operations through congested corridors.
Key Features
- Expanded mass transit infrastructure in Miami-Dade County.
- Six rapid transit corridors with greater mode choice.
- New transit stations.
Outcomes
- Makes complex scientific concepts accessible to diverse audiences.
- Reduces transportation-related emissions.
- Significantly increases access to public transportation.
- Provides reliable service and improved travel time.
- New opportunities for transit-oriented development.
- Real-time arrival and departure information signage at transit stations.
Featured Projects

Interstate 4 at SR 557 Interchange Design-Build

Illinois’ Central Tri-State Tollway (I-294) Reconstruction

Modernizing WMATA’s Backup Operations Control Center

High-Availability Data Center and Security Operations Control Center Design

Meadows Maintenance Complex Substation Design

Tradepoint Atlantic Berth Modernization Structural Design

Modernizing CityLink’s Maintenance and Operations Center

Pennsylvania Turnpike Commission GeoBIM Implementation

San Antonio International Airport Consolidated Car Rental Facility

Ohio Statewide GIS Solutions Powered by Esri Technology

Merchants Bridge Main Span Truss Replacement & East Approach Retrofit

CREATE P3 Forest Hill Flyover Bridge and 71st Street Grade Separation

Los Angeles World Airports Consolidated Rental Car Facility Planning

NREL EV Infrastructure Design and Siting Assessment Tool
Featured News & INSIGHTS
How Tennessee DOT Modernized Work Zone Management Through an IT/OT Partnership

Replacing a Chicago Rail Bridge While Maintaining Continuous Service

Engineering Ingenuity: Replacing Bridge A32 and Grayland Station in Urban Chicago
From Data to Decisions: Connecting BIM, GIS, and Infrastructure Intelligence

GFT Welcomes Fuller as Transit & Rail Global Business Line Director

GFT Facilitates Emergency Response Tech & Demo Day at ITS America 2026

John Sadler, PE

Surbhi Kamboj, AICP, LEED AP