Substation and Power Distribution Design for Mine in Arizona

Client: Confidential Client
Our Role: Detailed Engineering Design, Procurement Assistance, and Construction Support

Construction site in a desert landscape with drilling rig, crane, trucks, and equipment spread across a dirt lot under a partly cloudy sky.

New electrical infrastructure was required to support expanding mining operations and connect the site to the regional transmission system. The project included the development of multiple substations, overhead power lines, and supporting site infrastructure to provide reliable power for mining and processing activities.

The design needed to accommodate complex electrical loads, maintain system protection and operational safety, and support long-term reliability for critical industrial operations. The project also required coordination of civil and electrical design elements across a large site footprint while meeting environmental and operational requirements.

GFT provided detailed engineering design, procurement assistance, and construction support services for three substations, a primary power line, and a secondary branch power distribution system for the mine site. The electrical infrastructure connects to Tucson Electric Power through a 138 kV bus from the local substation.

The design included the development of the main substation, the concentrator area substation, and the shaft area substation, each configured to support site-specific electrical loads and operational requirements. The substations incorporate incoming overhead lines, high-capacity transformers, circuit protection equipment, and supporting electrical systems to provide reliable power distribution across the mine site.

Civil/site design services covered approximately 200,000 square feet of substation infrastructure and included grading, drainage, access road design, perimeter fencing, and stormwater management planning. The team also coordinated environmental requirements and engineering evaluations to support construction and long-term site performance.

Key Features

  • Design of three substations supporting mining and processing operations.
  • Connection to the regional transmission system through a 138 kV bus.
  • Installation of multiple high-capacity transformers and circuit protection equipment.
  • Design of primary power line and secondary branch power distribution system.
  • Civil/site design covering approximately 200,000 square feet of infrastructure.
  • Grading, drainage, roadway, and perimeter security infrastructure design.
  • Stormwater pollution prevention planning and environmental coordination.
  • Engineering evaluations to support construction and operational reliability.

Outcomes

  • Delivered reliable electrical infrastructure to support expanding mining operations.
  • Enabled safe and efficient power distribution across the mine site.
  • Integrated electrical and civil design to support long-term operational performance.
  • Provided construction-ready engineering solutions for critical industrial infrastructure.