Newark, OH
Thornwood Crossing Connector, Roundabout & Bridge Replacement
Client: City of Newark
Our Role: Bridge Design, Hydrologic and Hydraulic Analysis, Roadway Design, Roundabout Design

The historic Showman Arch Bridge, a three-span stone and concrete arch structure originally built in 1835 as part of the Ohio and Erie Canal system, had reached the end of its useful life. The aging bridge over Raccoon Creek presented growing safety concerns, contributed to recurring flooding, and constrained the connectivity and mobility needed to support Newark’s long-term economic growth.
GFT delivered planning, design, and construction services to replace the aging crossing with a modern, functional corridor that addressed both infrastructure performance and community priorities. The project balanced transportation improvements with cultural responsibility, coordinating with Native American tribes and fulfilling Section 106 requirements to ensure significant archaeological findings were documented and preserved. The result is a safer, better-connected roadway network positioned to serve Newark residents for decades to come.
Key Features
- The durable steel girder bridge over Raccoon Creek meets modern traffic demands and addresses flooding.
- A roundabout at Thornwood Drive and Reddington Road improves traffic flow, reduces congestion, and increases safety.
- A comprehensive hydrologic and hydraulic analysis updated existing models.
- Native American tribes coordinated and documented the preservation of archaeological resources.
- Collaboration with Marathon Pipe Line avoided costly pipeline relocation.
Outcomes
- Replaced the outdated crossing with a direct, efficient connection that improves traffic flow for residents, businesses, and commuters.
- Retaining the Showman Arch Bridge preserved a local landmark that is eligible for the National Register of Historic Places.
- The redesigned bridge and optimized floodplain configuration effectively reduced flooding risks in the area, improving public safety and the surrounding environment.





Featured Projects

Environmental Assessment and Detailed Design for Stevenson Road North Corridor

Thornwood Crossing Connector, Roundabout & Bridge Replacement

Meadowlands Pedestrian Bridge Expansion at MetLife Stadium

Rehabilitation of Six Thunder Bay Structural Culverts

North Wilkesboro Speedway Pedestrian Bridge

Gardiner Expressway Section 5 Detailed Design

Garden State Parkway Shoulder Widening Milepost 30-35

Henry E. Kinney Tunnel Rehabilitation and Pedestrian Plaza Project

Harry W. Nice/Thomas “Mac” Middleton Bridge Replacement

Houbolt Road Extension and Diverging Diamond Interchange (DDI)

Merchants Bridge Main Span Truss Replacement & East Approach Retrofit
Featured News & INSIGHTS
Replacing a Chicago Rail Bridge While Maintaining Continuous Service

Earthquake Resilience: Scenario Strategies for Critical Infrastructure

From Roadway to Rail Trail: Adaptive Reuse of the Mount Carbon Bowstring Truss
From Capture to Concept: Accelerating Infrastructure Planning With Remote Sensing and AI

Scott Bennett Elected to ITS America Board of Directors

In the News: GFT’s Interstate 5 Reconstruction Project Featured in Roads & Bridges Magazine

Kevin Burgess, PE

John Bergman, PE