American Electric Power (AEP) outsourced transmission line engineering design, material procurement support, construction support, and close-out activities for the Arlington-Blanchard-Carey Project in Hancock County, Ohio, to GFT. The project builds two greenfield substations and eliminates radial transmission lines by converting the Dunkirk–Arlington 34.5 kV circuit to 69 kV and constructing a new transmission line between Arlington Station and a three-way switch outside Hancock-Wood Co-op’s Blanchard Station. Reliability concerns in the Carey area required additional transmission line rebuilds, removal of normally open switches, and installation of a three-breaker ring bus configuration. Detailed engineering design began in 2021, with the final segment anticipated to be placed in service in 2026, creating a less fragmented and more flexible transmission system with more reliable service for the eight delivery points affected.
Key Features
- Ten-mile greenfield 69 kV transmission line design.
- Over 25 miles of 69 kV transmission line rebuilds.
- Short-span construction with horizontal post steel structures and all-dielectric self-supporting fiber installation.
- Design supporting distribution underbuilds and joint ownership coordination.
Outcomes
- Improved system flexibility and reduced network fragmentation.
- Increased reliability for eight delivery points and wholesale customers.
- Modernized transmission infrastructure supports long-term regional service needs.
Featured Projects

Transmission Line and Substation Engineering

Freedom-Willis 69 kV Transmission Line Development

Meadows Maintenance Complex Substation Design

Substation and Transmission Design for Solar Integration in Maine

Substation and Power Distribution Design for Mine in Arizona

Substation Expansion Supports Data Center Energy Demand

Flexible Site Layouts to Unlock Sunbury’s Data Center Potential

Hydropower and Power Distribution Facilities Security Risk Assessment
Featured News & INSIGHTS
What Power Utilities Can Do Now: A Roadmap to Prepare for Extreme Weather

Power Up the Possibilities With 3D Design for Substations

Strong Foundations for Reliable and Resilient Power Delivery

Integrating Engineering and GIS: The Great Merge

In the News: Tackling Utility Emergency Preparedness With Whole-Community Resilience

Juras Named Executive Director of Power Business Group

Walter Kutschke, PhD, PE

Mike Cozzolino, PE