Harris County, TX
Tunnel Boring for WHCRWA’s Major Water Supply Project
Client: West Harris County Regional Water Authority (WHCRWA)
Our Role: Program Manager

The Suzzann TBM is working on Surface Water Supply Project (SWSP) Segment B3 in Harris County. This TBM will excavate approximately 4.4 continuous miles of 126-inch-diameter tunnel for a 96-inch-diameter water line.
The Sheryl TBM (named in honor of late Right-of-Way Manager Sheryl Bookman) is working on SWSP Segment B1/B2 in Harris County. She will excavate approximately 1.8 miles of 132-inch-diameter tunnel for mainly a 96-inch-diameter waterline. Overall, Segment B1/B2 will have about 10 miles of 96-inch-diameter waterline, with some dug by other TBMs.
WHCRWA is one of the largest water supply programs in the region. DEC manages the $1.8 billion program in coordination with more than 120 municipal utility districts, cities and regulatory agencies. DEC leads a team of internal and external professionals tasked with designing and building more than 100 miles of pipelines and three booster pump stations to deliver more than 150 million gallons a day of surface water to the service area’s growing population.
Featured Projects

Long-Term Control Planning and GIS Mapping for Hazleton Sewer System

Houston Area Water Supply System Program Management

Palos Verdes Recycled Water Pipeline and Lago Seco Pump Station Design

Valley Center North County Emergency Water Storage Project

Center Street Water Treatment Plant Upgrade

Lake DeForest Water Treatment Plant Upgrade and PFAS Removal Design

Ocean Outfall Legislation Program and Construction Management Services

Wastewater Consent Decree Program Management and Construction Management Services

Surface Water Supply Project Segment C2 Program and Construction Management

Baxter Water Treatment Plant Raw Water Basin Dredging

Tunnel Boring for WHCRWA’s Major Water Supply Project

Hopewell Water Treatment Plant Industrial Pump Station and Chemical/UV Facility

Lehigh County Authority Water Main Replacement
Featured News & INSIGHTS
Searching for Water: Engineering Solutions for the Colorado River’s Survival

How to Negotiate NPDES Permit Limits: Lessons From 40 Years of Clean Water Act Practice

UPCOMING 10/15: The Good, the Bad & the Biosolids: Carlisle’s Path to Class A

UPCOMING 10/22: Taking Back Control: Managing Cost and Risk Through Collaborative Delivery

Brown Receives 2026 George Warren Fuller Award From AWWA

In the News: WHCRWA Honors GFT’s Wayne Ahrens for 25 Years of Service

Yovani Zelaya, PE

Abe Khademi, PEng