New Marlborough, MA
Umpachene Falls Road River Bridge Replacement
Client: Massachusetts Department of Transportation Highway Division
Our Role: Design, Construction Engineering Support

Just outside New Marlborough, Massachusetts, sits the verdant Umpachene Falls Park. The park is a regional recreational staple, featuring a beautiful waterfall from the Konkapot River and lush natural scenery.
In 1950, the Umpachene Falls Road bridge was erected as a single-span, steel, three-girder superstructure with timber decking. Over the next 60-plus years, the bridge became worn and, in 2012, was closed to vehicular traffic due to a “structurally deficient” rating.
GFT provided engineering design and construction-phase services for the Umpachene Falls Road over Konkapot River bridge replacement project. Our team developed the preliminary and final design of the bridge and approach roadways, including:
- Geotechnical investigations and bridge foundation design.
- Bridge superstructure design.
- Hydraulic analysis of the Konkapot River.
- Drainage system improvements.
- Coordination of utility relocations.
- Roadside safety/guardrail improvements.
- Landscaping design.
- Environmental permitting.
- Community outreach.
We also provided construction engineering support in partnership with the contractor and the Massachusetts Department of Transportation (MassDOT) district inspection team.
GFT designed a replacement bridge structure with prestressed concrete adjacent box beams on cantilevered abutments. The team used prestressed concrete bridge elements as an accelerated bridge construction (ABC) solution, which compressed the project schedule. ABC techniques also allowed the bridge beams to be fabricated in a more controlled environment before being shipped to the project site, enhancing the overall quality of the bridge elements.
Given the remote project site and constrained public right-of-way, construction access and staging required careful consideration during design.
GFT designed the bridge structure using staged construction to maintain public access throughout the project. The approach roadways on each side of the bridge were narrow, and the areas beyond were heavily vegetated. Requirements for cranes and other construction equipment to demolish the existing bridge and install beams for the new bridge required clearing some of this vegetation beyond the roadway limits.
Our team identified the optimal alternative for this. Working closely with the Massachusetts Division of Fisheries and Wildlife, we developed solutions for mitigating the work that included new wildlife landscaping, removal of invasive vegetation, and measures for beaver control to protect new and existing trees within the project area.
Key Features
- New bridge over the Konkapot River.
- Drainage system improvements.
- New wildlife landscaping.
- Removal of invasive vegetation.
Outcomes
- Makes complex scientific concepts accessible to diverse audiences.
- Improved public access to Umpachene Falls Park.
- Heightened roadway safety.
- Preservation of character of the surrounding park environment.
- Enhanced recreational mobility to the public recreational facilities.
- American Council of Engineering Companies (ACEC) Massachusetts, 2023, Bronze Award.
Featured Projects

Interstate 4 at SR 557 Interchange Design-Build

Thornwood Crossing Connector, Roundabout & Bridge Replacement

Illinois’ Central Tri-State Tollway (I-294) Reconstruction

Modernizing WMATA’s Backup Operations Control Center

High-Availability Data Center and Security Operations Control Center Design

Meadowlands Pedestrian Bridge Expansion at MetLife Stadium

VRE Manassas Park Station Parking Expansion

North Wilkesboro Speedway Pedestrian Bridge

Gambo Bridge Replacement at Naval Support Facility Dahlgren

Gardiner Expressway Section 5 Detailed Design

Garden State Parkway Shoulder Widening Milepost 30-35

Harry W. Nice/Thomas “Mac” Middleton Bridge Replacement

Houbolt Road Extension and Diverging Diamond Interchange (DDI)

Merchants Bridge Main Span Truss Replacement & East Approach Retrofit
Featured News & INSIGHTS
Replacing a Chicago Rail Bridge While Maintaining Continuous Service

Design-Build Rail Infrastructure at Harold Interlocking

From Data to Decisions: Connecting BIM, GIS, and Infrastructure Intelligence

From Roadway to Rail Trail: Adaptive Reuse of the Mount Carbon Bowstring Truss
Scott Bennett Elected to ITS America Board of Directors

In the News: GFT’s Interstate 5 Reconstruction Project Featured in Roads & Bridges Magazine

John Sadler, PE

John Bergman, PE