Our firm first investigated the existing condition of the dam to determine seismic vulnerabilities and anticipated deformations. We then designed a stability buttress to mitigate against potential hazards. Regulators were also concerned with the stability of a stacked mortared rock wall that makes up the downstream shell of the dam at the tallest section; stability analyses allayed those concerns, however. Excavation for the buttress foundation was made down to bedrock to provide solid support after groundwater infiltration was found to affect the integrity of on-site soil.
Building the buttress required the demolition of the existing intake structure and construction of a new one approximately 50 feet further upstream, which included extending the two low-level outlet (LLO) pipes. The team used poured concrete to create the new structure’s foundation slab and walls, and the encasement of the LLO pipes. As part of the design, a drawdown analysis was performed to accurately account for the outflow capabilities of the new LLO system, ensuring compliance with California Division of Safety of Dams requirements.
Key Features
- Rock-fill buttress strengthens existing dam and mitigates against soil liquefaction hazards.
- LLO system extension accommodates new buttress and maintains regulatory water flow.
- Lake drawdown accomplished with minimal environmental disturbance.
- Drawdown analysis reflects outflow capabilities of extended LLO system.
Outcomes
- Enhanced dam stability to withstand earthquake forces and prevent damage.
- Resistance to deformations from soil liquefaction hazards.
- Improved water storage control.
Featured Projects

Valley Center North County Emergency Water Storage Project

Priest Rapids and Wanapum Dam Safety Engineering Services

Risk-Informed Decision-Making at Union Valley Dam

Hawaiian Dam Safety Seismic Hazard Assessment

Hydropower and Power Distribution Facilities Security Risk Assessment

Yuba Water Agency Cybersecurity Assessment

Hydroelectric Plant Penstock Data Acquisition System Upgrade

Upper Blue Lake Dam Seismic Retrofit Project

PHX Sky Train Stage 2 Automated People Mover System
Features News & INSIGHTS
Searching for Water: Engineering Solutions for the Colorado River’s Survival

In The News: Francisco Lasta Featured in The Guardian

Scott Bennett Elected to ITS America Board of Directors

Dina Hunt, PE

Jonny Rogado, PE, SPRAT I