Miami-Dade County, Fla.
Wastewater Consent Decree Program Management and Construction Management Services
Client: Miami-Dade County Water and Sewer Department
Our Role: Program Management and Construction Management

Known for its vibrant culture, warm climate, and abundant outdoor recreation, Miami-Dade County has grown significantly over the past few decades. The population has increased by nearly 114% since 1969; today, over 2.5 million people call it home.
However, this growth, combined with the county’s low-lying geography and proximity to sensitive coastal ecosystems like the Florida Everglades and Biscayne Bay, has made it vulnerable to environmental challenges. Aging sewer pipelines, which transport organic matter and wastewater, have become susceptible to leaks, failures, and sanitary sewer overflows, posing serious risks to public health and the environment.
Between 1995 and 2011, the Miami-Dade Water and Sewer Department (WASD) invested $1.8 billion to expand its sewer system capacity and reduce sewage overflows. This investment increased the ability to manage billions of gallons of wastewater to keep pace with the region’s population surge and improve resilience to climate impacts and extreme storm events like hurricanes, successfully reducing overflows.
Nevertheless, aging infrastructure continued to challenge the system, leading to further sanitary sewer overflows and underperforming treatment plant processes. In response, Miami-Dade County entered a 15-year, $1.6 billion federally mandated consent decree to implement capital improvements to address the wastewater collection and treatment plant processes.
In a subconsultant role, our team is providing professional services for the programmatic implementation of the consent decree program during the preconstruction and construction of 82 capital projects. The projects span three major wastewater treatment plants, 33 pump stations, and numerous pipeline replacements, all under tight deadlines imposed by the consent decree.
Delivering the consent decree program requires a team of experts who understand the regulatory mandates and technical challenges and can work collaboratively. Our team of project managers, construction managers, engineers, and construction inspectors collaborates closely with WASD’s leadership, operations and procurement teams, and regulatory bodies to ensure timely and compliant project execution.
Document control platforms include Proliance, SharePoint, and e-Builder to streamline processes, enhance communication, and minimize project risks. Through workshops and strategic planning, we’ve helped develop a robust program framework tailored to WASD’s needs.
Each project undergoes rigorous oversight, from initial engineering verification through design development and risk management, ensuring milestones are met. During construction, our managers oversee contractors to maintain compliance with contract documents, manage safety requirements, monitor progress, and handle change orders. Our ability to manage projects effectively is critical to meeting the compressed deadlines and ensuring the program’s long-term success.
Key Features
- Program and construction management services for 82 wastewater treatment plant projects and 33 sewer pump station capital projects.
- A co-located project management and construction management team to ensure collaboration and communication.
- Strong program controls.
- Strategic construction management team designation for wastewater treatment plants and pump stations.
- Comprehensive program lifecycle and capital budget expenditure management.
- Budget constraints and change control.
- Program management tools and procedures.
- Effective knowledge transfer and succession plans.
Outcomes
- Managing the upgrades to WASD’s wastewater treatment facilities ensures Clean Water Act compliance by reducing sanitary sewer overflows and mitigating environmental risks.
- Modernizing sewer infrastructure through targeted construction projects improves the region’s public health by reducing failures and contributes to sustainable economic growth.
- Implementing resilient standards to address sea level rise and storm hardening for the federally mandated wastewater consent decree program secures system reliability and resilience in a timely manner.




Featured Projects

Long-Term Control Planning and GIS Mapping for Hazleton Sewer System

Houston Area Water Supply System Program Management

Palos Verdes Recycled Water Pipeline and Lago Seco Pump Station Design

Valley Center North County Emergency Water Storage Project

Priest Rapids and Wanapum Dam Safety Engineering Services

Gambo Bridge Replacement at Naval Support Facility Dahlgren

Risk-Informed Decision-Making at Union Valley Dam

Orange County Coastal Storm Program Management

Ohio Statewide GIS Solutions Powered by Esri Technology
Featured News & INSIGHTS
Searching for Water: Engineering Solutions for the Colorado River’s Survival

What’s Driving the Global Data Center Boom?

UPCOMING 10/22: Taking Back Control: Managing Cost and Risk Through Collaborative Delivery

UPCOMING 11/12: PFAS in 2026: From Detection to Decisions

In the News: Tackling Utility Emergency Preparedness With Whole-Community Resilience

Brown Receives 2026 George Warren Fuller Award From AWWA

Yovani Zelaya, PE

Abe Khademi, PEng