Yardley, PA
Yardley Water Treatment Plant Upgrades
Client: Pennsylvania American Water
Our Role: Design

The Yardley Water Treatment Plant (WTP), a half-century-old facility located in Yardley Borough, is owned by Pennsylvania American Water, a subsidiary of the largest investor-owned water utility in the state.
Serving more than 13,000 homes and businesses, portions of the WTP were outdated and well past their useful life. As part of a robust $400 million capital improvement program, Pennsylvania American Water reserved $22.6 million to implement significant upgrades to multiple treatment processes at its Yardley facility.
Adding these new, state-of-the-art water treatment processes enabled the client to meet the U.S. Department of Environmental Protection’s (DEP) Long-Term 2 (LT2) Enhanced Surface Water Treatment Rule and improve drinking water quality and safety as well as reliability of water service for customers in Yardley, Lower Makefield, and Falls Township.
To reduce viruses and bacteria that could be present in surface water sources, Pennsylvania American Water engaged GFT to design a new ultraviolet (UV) disinfection system at the Yardley WTP. Pre-treatment improvements included a sodium permanganate feed system at the raw water pump station and a new carbon feed building at the WTP to improve the quality of raw water entering the WTP.
GFT also implemented a new pre-treatment process building that includes a carbon contact basin, flocculation tanks, and plate settler sedimentation tanks to replace an aged lamella clarifier system.
Designers also included a new addition to the WTP building to house the new UV disinfection system and two new chemical systems. Improving worker safety, sodium hypochlorite and liquid ammonium sulfate chemical systems replaced the existing chlorine gas systems, and all emergency safety showers were upgraded to circulate tempered water per OSHA regulations.
Pennsylvania American Water incorporated several residuals handling improvements, which included replacing the sludge collection system within the existing wastewater basins, adding a new thickener tank to improve solids removal, and replacing the pump associated with the facility’s sludge collection and recycling systems.
To support these new upgrades, the design team modified the existing main distribution switchboard and installed a new sub-distribution panel (SDP). Redundant ‘A’ and ‘B’ feeds connect the main distribution switchboard and SDP to downstream distribution and process equipment, including motor control centers in the new pre-treatment building, allowing system maintenance while retaining plant operations.
Analysis of existing load data indicated that the current service capacity is sufficient. However, the existing standby emergency generator was deemed inadequate and replaced with a more powerful unit to ensure continued plant operation during a utility power outage.
Key Features
- New UV disinfection system.
- Sodium hypochlorite and liquid ammonia systems replaced existing gas systems.
- New sodium permanganate feed system at the raw water pump station.
- New collection system and thickener tank to improve sludge removal.
- New pre-treatment building to replace existing sedimentation system.
Outcomes
- UV disinfection strengthens protection against pathogens and microorganisms in the source supply.
- Sodium hypochlorite and liquid ammonia sulfate provide a safer work environment for employees.
- Pre-treatment upgrades enhance water quality by removing more solids, thus improving water treatment.
- Improving sludge collection improves recycled water quality and reduces sludge hauling costs.
- Facility is fully compliant with LT2 requirements.
Featured Projects

Long-Term Control Planning and GIS Mapping for Hazleton Sewer System

Palos Verdes Recycled Water Pipeline and Lago Seco Pump Station Design

Valley Center North County Emergency Water Storage Project

Center Street Water Treatment Plant Upgrade

Lake DeForest Water Treatment Plant Upgrade and PFAS Removal Design

Ocean Outfall Legislation Program and Construction Management Services

Wastewater Consent Decree Program Management and Construction Management Services

Baxter Water Treatment Plant Raw Water Basin Dredging

Tunnel Boring for WHCRWA’s Major Water Supply Project

Hopewell Water Treatment Plant Industrial Pump Station and Chemical/UV Facility
Featured News & INSIGHTS
Searching for Water: Engineering Solutions for the Colorado River’s Survival

How to Negotiate NPDES Permit Limits: Lessons From 40 Years of Clean Water Act Practice

UPCOMING 10/15: The Good, the Bad & the Biosolids: Carlisle’s Path to Class A

UPCOMING 10/22: Taking Back Control: Managing Cost and Risk Through Collaborative Delivery

Brown Receives 2026 George Warren Fuller Award From AWWA

In the News: WHCRWA Honors GFT’s Wayne Ahrens for 25 Years of Service

Abe Khademi, PEng

David Haywood, PE