Chicago, Ill.
Zero-Emission Fleet Planning for the Chicago Transit Authority (CTA)
Client: Chicago Transit Authority
Our Role: Electric Vehicle Modeling

In April 2019, the Chicago City Council passed a resolution to electrify their entire bus fleet by the year 2040. Almost two years later, the City of Chicago unveiled Charging Forward: CTA Bus Electrification Planning Report, the first-ever roadmap for the zero-emission vehicle electrification of the city government fleet, facilities, and supporting infrastructure by 2040.
As part of the Chicago Transit Authority’s (CTA) Electric Bus Planning Program, GFT performed two primary tasks to help transition the agency from the planning stages to implementation of the zero-emission fleet:
- Developed a detailed model to apply specific route and technology parameters to determine the charging infrastructure needed, including the number and type of chargers to support operations. The route modeling scope focused on Chicago Garage, 103rd Garage, 77th Garage, and Forest Glen Garage. At each location, GFT looked at the entire vehicle fleet management network associated with that garage, including all on-route locations, to analyze route energy requirements and fast charging sequencing scenarios to reduce peak load demand and guide efficient installations.
- Developed a new chapter within the CTA Infrastructure Design Criteria Manual (IDCM) to address all necessary infrastructure improvements to implement electric bus operations at garages and on-route locations, including an exhaustive review of lessons learned and best practices from throughout the transit industry, and collaborations with local partners. The design criteria included:
- Guidance related to energy management upgrades and substation development.
- Charging system infrastructure layouts.
- Maintenance area requirements.
- Life safety upgrades.
- Fire suppression techniques.
GFT conducted in-depth research and data collection on fire suppression, safety best practices for electric buses, and current practices in collocating electric and fuel cell buses.
GFT partnered with GeoDecisions — the geospatial, data science, and enterprise technology division — to develop the needed simulations for the route analysis and algorithms necessary to make final fleet electrification recommendations.
Key Features
- Battery electric bus (BEB) modeling and charger sequencing to reduce peak load.
- Assessment of BEB infrastructure adoption at four garages.
- Electric vehicle charging station design criteria development for BEB infrastructure installation.
Outcomes
- Identification of specific electrical load needs at four facilities.
- Optimization of loads with a charging strategy to reduce peak requirements.
- Development of design criteria to support industry best practices for electric fleet charging, storage, and maintenance.
Featured Projects

Thornwood Crossing Connector, Roundabout & Bridge Replacement

Modernizing CityLink’s Maintenance and Operations Center

Ohio Statewide GIS Solutions Powered by Esri Technology

Merchants Bridge Main Span Truss Replacement & East Approach Retrofit

NREL EV Infrastructure Design and Siting Assessment Tool

Zero-Emission Fleet Planning for the Chicago Transit Authority (CTA)

Oklahoma Road Usage Charge Pilot Program

Transportation Planning for the Future: Iowa DOT

ODOT Stark-77 Bridge Replacement and Rehabilitation
Featured News & INSIGHTS
Engineering Ingenuity: Replacing Bridge A32 and Grayland Station in Urban Chicago
GFT, Clients Honored with 2026 ACEC Engineering Excellence Awards

In The News: GFT Named COMTO Northern California’s 2025 Corporation of the Year

Deanne Winkelmann, AICP

Dan Reinke, PE